Laserfiche WebLink
UB / 16 / ;'. oOA 10 ; 50 FAX 7722310342 2012 <br /> • All planning , permitting , and construction on the site shall be the responsibility of <br /> the SOPOA, and shall be in accordance with the rules and regulations of Indian <br /> River County. Site plan approval must be obtained by SOPOA prior to any site <br /> work taking place. <br /> Restricted access to Parcel One shall be made available from a single gated <br /> location, the location of which shall be coordinated with the County Utilities ` <br /> Department. <br /> Access to Parcel Two shall be by foot traffic only, and not be from AIA or the <br /> adjacent constructionlutility easement. <br /> Only those Sea Oaks employees authorized to enter the site will be allowed <br /> access . Parcel One shall not normally be accessible by Sea Oaks residents , <br /> Parcel Two is strictly off limits to the public, and shall be enforced by signage <br /> provided by SOPOA. <br /> • Development of Parcel One shall proceed with the utmost care , with the <br /> preservation of existing vegetation such as mature Oaks and Palms required. <br /> Rernoval of foliage is limited to exotics only. Dead or dying palms may be <br /> removed , but must be replaced by SOPOR. All removal and replacement must be <br /> coordinated with the County . All exotic vegetation will be hand removed , not <br /> openly sprayed, and no regrowth shall be permitted during the term of the <br /> License . The entire wastewater treatment plant site shall be free of exotics within <br /> two (2 ) years, and shall be maintained in this condition throughout the life of the <br /> License Agreement . <br /> A minimum 18 inch high berm shall be constructed along the boundary of Parcel <br /> One and . Parcel Two , as delineated in Exhibit "A", utilizing surface material <br /> available on site. The continuous berm shall be maintained by SOPOA for the <br /> term of this License Agreement. <br /> • Any material or structure proposed to be positioned on Parcel Two must be <br /> approved by the Utilities Department, and shall be elevated above the Bound <br /> surface a minimum of 18 inches. In the event that future County construction <br /> necessitates a vacation of Parcel 2 , County shall notify SOPOA in writing twenty- <br /> four (24) months in advance of construction event, <br /> • All utilities associated with the License Agreement shall be coordinated by <br /> SOPOR, and shall be installed so as to not enter or encroach upon Parcel Two , <br /> SOPOR agrees to accept the aforementioned reclaimed water, and to continue to <br /> adhere to the terms of the Irrigation Agreement executed September 29 , 1989 . <br /> Additionally , in accordance with the above vacation notice, SOPOA agrees to <br /> abandon to the County all on-site irrigation facilities, utilizing SOPOA-owned <br /> facilities as a substitute . <br />