Laserfiche WebLink
Millstone Landing PI), Phnse 3 <br />&C. <br />A TRUE COPYt? // QU <br />CERTIFICATION Of -11 1+S PAGE <br />J.K. BARTON, CLERK ff <br />C7RIC-Ar 1� D(T <br />SECOND MODIFICATION TO AND ASSIGNMENT OF <br />CONTRACT FOR CONSTRUCTION OF REQUIRED <br />SIDEWALK IMPROVEMENTS <br />No. PD-04-0844-(C)SIDEPI-13 (2003100068-55786) <br />WHEREAS, on October 9, 2007, Shelby Homes at Millstone, Inc., a Florida <br />corporation, entered into Contract for Construction of Required Sidewalk Improvements No, <br />PD-04-08-14(C)SIDI PH3 (2003100068-55786), copy attached, with Indian River County in <br />connection with property platted as Millstone Landing P.D., Phase 3; and <br />WHEREAS, on October 9, 2009 said contract was modified by Modification to <br />Contract for Construction of Required Sidewalk Improvements, copy attached, wherein <br />Shelby Homes at Millstone, Inc. (1) requested an additional 2 -year extension to October 16, <br />2011 to complete the remaining required sidewalks; and (2) requested a reduction in the <br />amount of security necessary to complete the remaining sidewalks not deferred; and <br />WHEREAS, SLV Millstone, L.L.C., a Delaware limited liability company has <br />acquired the project; and <br />WHEREAS, SLV Millstone, I.,.IX, wishes to assume the obligations under said <br />ConU•act for Construction of Required Sidewalk Improvements, as modified, and replace the <br />security either in the form of a letter of credit or cash to guarantcc the completion of the <br />remaining sidewalks not deferred; and <br />WHEREAS, under paragraph 10 of said Contract for COnst►'lleti0n of Required <br />Sidewalk Improvements, the agreement shall not be assigned without the express written <br />approval of the County; <br />NOW, THEREFORE, IN CONSIDERATION OF TI[C MUTUAL COVENANTS <br />AND PROMISES HEREIN CONTAINED, the parties agree as follows: <br />1. The existing Regions Bank Letter of Credit No. 55101730 shall be replaced <br />with either a letter of credit acceptable to Indian River County or cash in the amountf <br />O <br />$45,168,88. <br />2. The assignment of Contract for Construction of Required Sidewalk <br />Improvements No. PD-04-08-14(C)SIDEPII3 (2003100068-55786), as modified, is accepted, <br />provicled, however, that (a) substitute security either in the form of an acceptable letter of <br />credit or cash be posted with Indian River County no later than 5:00 p.m, on .January 7, 2011 <br />to guarantee completion of the required sidewalk improvements not deferred, and (b) a <br />completed Notice of•rI,ransfer and Assumption of Planned Residential Development Approvals <br />and Obligations is subrnitted to Indian River County no later than 5:00 P.M. on January 7, <br />2011, otherwise this modification and assignment shall be deemed null and void. <br />