Laserfiche WebLink
PROCTOR Tuesday, April 16, 2013 <br /> Construction Co. <br /> General Contractors Mr. Lynn Williams <br /> CGC034069 Indian River County Board of County Commissioners <br /> 1801 27th Street <br /> 2050 us-1 suite 200, Vero Beach, FL 32960 <br /> Vero Beach, Florida 32960 <br /> Telephone; (772) 234-8164 <br /> Fax: (772) 234'8188 RE: Potential Change Order Number CSI-011 <br /> www.proctorw.com Indian River Crime Scene Investigation Facility-IRC-CSI01/2013 <br /> Dear Mr. Williams, <br /> Reference is made to Indian River County Board of County Commissioners request from Proctor <br /> Construction to provide pricing covered under PCO Number CSIA11, for the following extra work: <br /> Replace existing concrete drive and parking area with 1.5" asphalt as requested by Owner. <br /> The following is a detailed itemization of all extra costs. <br /> Item Number Description Proposed Amount Company <br /> 001 Replace existing concrete drive and $ 131922 .00 <br /> parking area as requested by Owner. <br /> Grade, 10" rock & 1 .5 " Asphalt at <br /> Main Low Area (Approx. 405 <br /> 002 Replace existing concrete drive and $3,610.00 <br /> parking area as requested by Owner. <br /> Grade, 10" rock & 1 . 5 " Asphalt east of <br /> main low area (Approx 105 s <br /> 003 Replace existing concrete drive and $31610.00 <br /> parking area as requested by Owner. <br /> Grade, 10" rock & 1 .5 " Asphalt south <br /> of main low area (Approx 105 s <br /> 004 Demo Existing Concrete as per $31000.00 <br /> Owners Request <br /> 005 Subgrade and Concrete Testing $450.00 <br /> Allowance <br /> 006 Survey & As Built $500 .00 <br /> 007 Deduct originally indicated concrete ($ 1 ,680.00) <br /> parking area (3 parking spots & <br /> radiused area) Approx 420 Sf <br /> Level 1 10.00% Overhead Markup $22341 .20 <br /> Level 2 5 . 00% Profit Markup $ 1 ,287. 66 <br /> Level 1 .00% Insurance Markup $270 .41 <br /> Level 4 1 .00% Bond Markup $273 . 11 <br /> Total Amount $279584.38 <br /> This Change Order Request includes but is not limited to, the following qualifications and/or <br /> clarifications: <br /> 1 . Work specifically outlined within the summary as further described herein. <br /> 2. No additional building permit costs have been included for these changes to the contract. <br /> Proctor Construction shall not be held responsible for proceeding with changes prior to the <br /> building department review if applicable. <br /> 3 . This proposal is figured on performing said work during normal working hours. <br />