My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-227
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2015 12:16:22 PM
Creation date
10/1/2015 5:44:45 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
11/12/2013
Control Number
2013-227
Agenda Item Number
15.B.4
Entity Name
Republic Services of Florida
Subject
Third Amendment to Contract Agreement
Solid Waste Operations & Maintenance
Area
3905 Oslo Road
Alternate Name
SWDD
Supplemental fields
SmeadsoftID
12605
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHEREAS, the parties desire to amend the Contract to allow for the installation and operation <br /> of Fleetzoom . <br /> NOW, THEREFORE, in consideration of these premises, and other good and valuable <br /> consideration, the receipt and sufficiency of which are hereby acknowledged, the parties <br /> hereto, intending to be legally bound, covenant and agree to amend the Contract as follows : <br /> 1 . The existing Article 1 — SCOPE OF WORK of the Contract is modified to include the <br /> following: <br /> RAIN FLAP REMOVAL PROJECT, The Contractor shall undertake and complete the Rain <br /> Flap Removal project at the landfill which is the removal of a temporary liner feature <br /> originally installed within Segment 3 Cell 1 to minimize the generation of leachate from <br /> rain water. The Contractor is authorized to use the services of American Environmental <br /> Group, Ltd . (AEG ) as a subcontractor on the project based on being the most cost <br /> effective and qualified vendor to perform the work. The Contractor will coordinate the <br /> project with the project engineer, Geosyntec, regarding their Construction Quality <br /> Assurance ( CQA) monitoring services for this project . <br /> Rain Flap Removal Prosect : <br /> 1 . Mobilization/Demobilization <br /> 2 . Liquid Dewatering/Pumping ( if needed ) <br /> 3 . Rain Flap Removal <br /> 4 . Materials <br /> FLEETZOOM . The Contractor shall install Fleetzoom at the Landfill, and shall be <br /> responsible for all subsequent operation, maintenance, repair or replacement of <br /> Fleetzoom during the term of the Contract. All costs related to the installation, <br /> operation and maintenance of Fleetzoom shall be borne by the Contractor. The <br /> Contractor further agrees to indemnify the District for any damage to the GCCS that is <br /> caused directly or indirectly by Fleetzoom during the term of the Contract. The <br /> Contractor may, at any time during the term of the Contract and at its sole discretion, <br /> remove or uninstall Fleetzoom, and may choose to replace it with a different monitoring <br /> system . Upon the expiration or termination of the Contract, the Contractor shall, at its <br /> sole discretion, (a ) uninstall and remove Fleetzoom or ( b ) sell Fleetzoom to the District <br /> (or if the District has contracted with a third party to maintain and operate the landfill <br /> GCCS, sell Fleetzoom to such third parry) at a mutually-agreed upon price. Upon the <br /> happening of either of the contingencies listed above, the Contractor' s responsibilities <br /> ( including but not limited to its responsibility to indemnify the District) related to <br /> Fleetzoom shall terminate, and in the case of subsection ( b), the District or the third <br /> party, as the case may be, shall assume all costs and responsibilities for the operation <br /> and maintenance, repair or replacement of Fleetzoom . Contractor shall not be <br />
The URL can be used to link to this page
Your browser does not support the video tag.