Laserfiche WebLink
4 <br /> in <br /> Indian River County Landfill <br /> Cell 1 East West Rain Flap Removal <br /> Bid Form (Note 1) <br /> Estimated <br /> Item Description Quantity Unit IInit Cost <br /> (Note II) Cost <br /> 1 Mobrlizatibn0e►nobitization (Note iii) 1 Lump Sum 05roo 3 rbp <br /> 2 Liquid Dewatering/Pmnping (NoteTVJ TBD Truckloads ZZSj� ZZ '�'b <br /> 3 Rain Flap Removal (Note V) 3 Days 35OO ( O SDG <br /> 4 Materials (Note VI) 1 Lump Sum $ 73 $ 7 *r <br /> 5 Sligo Submersible Pump (SSR Series 1 PSF) (Note Vin 1 Lump Sum Z roo Z CVO <br /> Total <br /> Notes: <br /> I Bidders shall provide list of equipment proposed for the construction activities intruding earthwork and geosynthetics for the work <br /> described in this Bid Form and shown on the Construction Drawings. Bidders shall also include the names and addresses of <br /> subconsultants they Propose for this project. <br /> H Quantities PRsenW herein are estimated quantities and should be vedfled by Contractor, if quantities are found to be diflerenk <br /> Contractor shall notify Engineer and Owner prior to starting work. Quantities that are not provided and that are wititin the scope of <br /> work shall be estimated and verified by Contractor and brought to Engineer's attention <br /> lII Mobilizatioridemobilization shall not exceed 200/a ofthe total bid price. <br /> IV TBD a to be determined. This item is optional and may or may not be required. ibis item involves potential dewatering(pumping of <br /> liquids that may have been accumulated, due to recent rainfall events, within the southern portion of Cell 1 (i.&, area ofcau I south <br /> of the east westrain flap) as shown on the Construction Drawings. Liquids shall be pumped to a tanker truck and transported to the <br /> Bio-solids facility for disposal which is appmximetely 3,300 fl (0.62 miles) onaway Sum the rain flap location, Contractor shell <br /> Provide unit cost for a tanker buck to pump and intnslwrt liquids to the Bie-solids facility, which is located at the landfllt facility. The <br /> tanker truck should have the capability to pump the liquids into the truck However. the lauM, operator has two pumps (one 34. <br /> pump and one 64n, pump that could be used of necessary. <br /> V Contractor shall provide equipment and labor for the removal of rain flap as shown on the Construction Drawings. Equipment used <br /> shall be approved by the Engineer prior to being used. The sand along the rain flap sball be carefully removed to expose the dein <br /> point between the flap and the cell liner. The flap shall be cut away from the can liner carefully to avoid any puncturing of the liner <br /> system. Upon gap removal, the geceomposhe that had been bent up behind the flap shell be folded down flat onto the liner against <br /> the existing geocomposite termination point In order to patch the geocomposite back together prior to reinstalling the sand cover, <br /> place a cap strip of geotextrle (ammUsy minimum) or approved equivalent over the seam and sew it into position. The Contractor shall <br /> ensure that no sand will infiltrate the geocomposite in the area of the patch. The Contractor shall also provide the required geotmWle <br /> material. Any excess sand from the rain flaplberm shall be sporead and graded into the as-constructed liars Protective layer of the <br /> southern portion of Cell 1% <br /> This item also includes the connection of the leachate collection line as shown in the Construction Drawings. This shalt be <br /> accomplished by cutting and cleaning both ends of the pipe at the liner flap location; providing a spool piece (appioximately 7 it long) <br /> of 6-in, dia. SDR I 1 HDPE pipe and two electro fusion couplers; and connecting the pipe together. The Contractor shall provide <br /> geotextile material to conned the leachato collection "burrito wrap" and shall place the Iesebate collection gravel around the pipe in <br /> the burrito prior to sewing the geotextrla overlap. The Owner will provide the gravel needed to the tie-in location but the Contractor <br /> shall be responsible for placing the geotextrle-gravel burrito as shown on the Construction Drawings. The Engineer has estimated <br /> three days for this work; Contractor shall indicate the number ofdays required for this work. <br /> VI This item includes the following materials needed for the project (i) &in. dia. SDR 11 HDPE spool pieces; (at) two 6-in. dia. electro <br /> fusion couplers; and (iii) g- Wsy nonwoven geotexhle required for the geocomposite tie-in point cap strip end for tying the leachate <br /> collection system gravel burrito together. The Owner will provide the gravel required to complete the burrito wrap. Approximately <br /> 3.6 cy of gravel will be required to constructed the pipe-gravel burrito in this section; this gravel should be obtained from the min flap <br /> berm along the leachate corridor plus a small stockpile on site. <br /> VIi The Contractor shall provide this leachate pump (see attached Cut Sheet) which will be used as a back up pump for Cell 1. This is a <br /> submersible pump for leachate collection in the side slope riser of Cell 1 . This item is optional and the Owner may elect to have this <br /> purchased as part ofthis contract <br />