My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-227
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2015 12:16:22 PM
Creation date
10/1/2015 5:44:45 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
11/12/2013
Control Number
2013-227
Agenda Item Number
15.B.4
Entity Name
Republic Services of Florida
Subject
Third Amendment to Contract Agreement
Solid Waste Operations & Maintenance
Area
3905 Oslo Road
Alternate Name
SWDD
Supplemental fields
SmeadsoftID
12605
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Landfill <br /> Cell I East West Rain Flap Removal <br /> Bid Form (Note I) <br /> Estimated <br /> Item <br /> Description Quantity Unit Unit Cost <br /> (Note 19) Cost <br /> 1 Mobilization/Demobilization (Note 111) 1 Lump Sum 351pp Sbp <br /> 2 Liquid Dewalering/Pumping (Note IV) TBD Truckloads 'Z .Z. Sp 2t,St1> <br /> 3 Rain Flap Removal (Note V) 3 Days 3 S 00 l0 SOO <br /> 4 Materials (Note VI) 1 Lump Sum <br /> 3750 g7 S <br /> 5 Sligo Submersible Pump (SSR Series I PSF) (Note VII) 1 Lwnp Sum Z SOO ZSOO <br /> Total <br /> Notes: <br /> I Bidders shall provide list of equipment proposed for the construction activities incicuding earthwork and geosyntheties for the work <br /> described in this Bid Foran and shown on the Construction Drawings. Bidders shall also include the names and addresses of <br /> subconsultants they propose for this project. <br /> 11 Quantities presented herein are estimated quantities and should be verified by Contractor. If quantities are found to be different <br /> Contractor shall notify Engineer and Owner prior to starting work. Quantities that are not provided and that are within the scope of <br /> work shall be estimated and verified by Contractor and brought to Engineers attention. <br /> III Mobilization/demobilization shall not exceed 20°/" of the total bid price. <br /> IV TBD = to be determined. This item is optional and may or may not be required. This item involves potential dewatering/pumping of <br /> liquids that may have been accumulated, due to recent minf}+Il events, within the southern portion of Cell 1 (i.e., area of Cell 1 south <br /> Of the east-west rain flap) as shown on the Construction Drawings. Liquids shall be pumped to a tanker track and transported to the <br /> Bio-solids facility for disposal which is approximately 3,300 f> (0.62 miles) one-way from the rain flap location. Contractor shell <br /> provide unit cost for a tanker buck to pump and transport liquids to the Bio-solids facility, which is located at the landfill facility. The <br /> tanker buck should have the capability to pump the liquids into the truck. However, the landfill operator has two pumps (one 34. <br /> pump and one &in. pump that could be used if necessary. <br /> V Contractor shall provide equipment and labor for the removal of rain flap as shown on the Construction Drawings, Equipment used <br /> shall be approved by the Engineer prior to being used. The sand along the rain flap shaft be carefully removed to expose the tio-in <br /> point between the flap and the cell liner. The flap shall be cut away from the cell liner carefully to avoid any puncturing of the liner <br /> system. Upon flap removal, the geocomposite that had been bent up behind the flap shall be folded down flat onto the liner against <br /> the existing geocomposite termination point In order to patch the geocomposite back together prior to reinstalling the sand cover, <br /> place a cap strip of geotextile (g-or/sy minimum) or approved equivalent over the seam and sew it into position. The Contractor shall <br /> ensure that no sand will infiltrate the geocomposite in the area of the patch. The Contractor shall also provide the required geotextile <br /> material. Any excess sand from the rain flap/berm shall be sporead and graded into the as-constructed liner protective layer of the <br /> southern portion of Cell L <br /> This item also includes the connection of the leachate collection line as shown in the Construction Drawings. This shall be <br /> accomplished by cutting and cleaning both ends of the pipe at the liner flap location; providing a spool piece (approximately 7 tt long) <br /> of&in. dia. SDR 11 HDPE pipe and two electro fusion couplers; and connecting the pipe together. The Contractor shall provide <br /> geotextile material to connect the leachate collection "burrito wrap" and shall place the leachate collection gravel around the pipe in <br /> the burrito prior to sewing the geotextile overlap. The Owner will provide the gravel needed to the tie-in location but the Contractor <br /> shall be responsible for placing the geotextile•gravel burrito as shown on the Construction Drawings. The Engineer has estimated <br /> three days for this work; Contractor shall indicate the number ofdays required for this work. <br /> VI This item includes the following materials needed for the project: (i) &in. din SDR 11 HDPE spool pieces; (it) two &in. dia, electro <br /> fusion couplers; and (iii) Smor/sy nonwoven geotextile required for the geocomposite tie-in point cap strip and for tying the leachate <br /> collection system gravel burrito together. The Owner will provide the gravel required to complete the burrito wrap. Approximately <br /> 3.6 cy of gravel will be required to constructed the pipe-gravel burrito in this section; this gravel should be obtained from the rain flap <br /> berm along the leachate corridor plus a small stockpile on site. <br /> V11 The Contractor shall provide this leachate pump (see attached Cut Sheet) which will be used as a back-up pump for Cell 1 . This is a <br /> submersible pump for leachate collection in the side slope riser of Cell 1 . This item is optional and the Owner may elect to have this <br /> purchased as part of this contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.