My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-019
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 11:13:31 AM
Creation date
10/1/2015 5:55:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bill of Sale
Approved Date
02/18/2014
Control Number
2014-019
Agenda Item Number
8.D.
Subject
Bill of Sale of Utility Facilities
Area
South County Regional Park Multi-Purpose Fields
Project Number
1126
Bid Number
2013009
Supplemental fields
SmeadsoftID
12979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. Watering: The areas on which the sod is to be placed shall contain sufficient moisture, <br />as determined by the Engineer, for optimum results. After being placed, the sod shall <br />be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks. <br />Thereafter, the Contractor shall apply water as needed until the sod roots and starts to <br />grow for a minimum of 60 days (or until final acceptance, whichever is latest). <br />J. Maintenance: The Contractor shall, at his expense, maintain the sodded areas in a <br />satisfactory condition until final acceptance of the project. Such maintenance shall <br />include repairing of any damaged areas and replacing areas in which the establishment <br />of the grass stand does not appear to be developing satisfactorily. <br />Replanting or repair necessary due to the Contractor's negligence, carelessness or <br />failure to provide routine maintenance shall be at the Contractor's expense. <br />The Contractor shall maintain the sodded area up to the final acceptance date as <br />directed by the Engineer. Grass height shall not exceed 6" without mowing. Clippings <br />shall be removed from sidewalk. <br />K. Article 570-9. The first two paragraphs under this Article are deleted and the <br />following substituted <br />The contract unit price for sodding shall include the costs of sod, fertilizer (2 <br />applications), sidewalk sweeping after mowing, mowing, pegging disposal of clippings, <br />water, tools, equipment, labor and all other incidentals necessary. <br />Item of Payment <br />Payment shall be made under: <br />B id Item No. 570-1-2A — Performance Turf (Sod) (Bahia) - Per Square Yard <br />B id Item No. 570-1-2B — Performance Turf (Sod) (St. Augustine) — Per Square Yard <br />SECTION - 700 - SIGNING AND PAVEMENT MARKINGS <br />A. Signing and pavement marking for traffic control shall conform to the <br />requirements of the Standard Specifications (2010), Manual on Uniform Traffic Control <br />D evices, Supplemental Specifications, Roadway and Traffic Design Standards, <br />manufacturer's specifications. <br />B Traffic Signs All existing signs which are the property of the Owner shall be <br />transported to the Indian River County Road and Bridge Maintenance Yard by the <br />Contractor during construction if they are within the construction limits. Care shall be <br />exercised by the Contractor during removal, storage and relocation so as not to <br />damage the signs. If any damage occurs, as determined by the Owner's Engineer or <br />Resident Construction Inspector, the sign shall be replaced by the Contractor with no <br />compensation. <br />C. AH reflective pavement markers shall be 4" x 4". <br />01025-16 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1302-IR Blvd Resurfacing (SCOP) US1 to 17th St\Admim\bid <br />documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.