My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-190
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 9:17:09 AM
Creation date
10/1/2015 5:35:42 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> Utility Coordination Services <br /> Senior Utility Coordinator $ 115 . 00/per hour <br /> Utility Coordinator $ 85 . 00/per hour <br /> CAD Technician $75 . 00/per hour <br /> Vacuum Excavation for Monitoring Wells, Soil Samples, etc . (pricing based on <br /> Environmental Services excavation up to 10 feet) <br /> 1 - 9 Monitoring Wells/Soil Samples $250 .00/each <br /> 10 - 19 Monitoring Wells/Soil Samples $200 .00/each <br /> 20 - 49 Monitoring Wells/Soil Samples $ 150 .00/each <br /> UTILITY CLEARING Using GPR/Conventional Electronic Line Locators $ 115 .00/per hour <br /> Exploratory Excavation Projects Larger excavation projects which require specialized $285 :00/per hour <br /> equipment (shoring, de-watering, etc .) will be quoted on a task <br /> by task basis. <br /> Concrete Radar Concrete assessment/inspection, grid scans, density <br /> Mapping/Imaging and debris assessment <br /> 1 Man Crew $ 115 .00/per hour <br /> Closed Circuit Televising <br /> Services $ 115 .00/per hour <br /> Maintenance of Traffic ( MOT) If required MOT specialists will be contracted and cost for <br /> same will be passed on with a 10% mark-up for coordination <br /> of same . <br /> SSMC MOT Lane Closures Per Lane Closure $350 .00/day <br /> Per Lane Closure $ 500 .00/night <br /> Survey Services for Utility Projects <br /> Project Manager/PSM $ 115 .00/per hour <br /> 2 Man Crew $ 115 .00/per hour <br /> 3 Man Crew $ 145 .00/per hour <br /> Clerical $ 50 .00/per hour <br /> GIS Mapping Services <br /> Personnel Classification <br /> Professional Engineer Project Management, Quality Control/Quality Assurance $ 115 .00/per hour <br /> Project Reviews <br /> GIS Analyst Database Design, Programming, Quality Control/Quality $ 85 . 00/per hour <br /> Assurance <br /> GIS Technician Data Entry, Date Editing $ 75 . 00/per hour <br /> 1 Man GPS Crew Field Asset Inventory (sub-meter) $65 . 00/per hour <br /> 2 Man GPS Crew Field Asset Inventory (sub-meter) $ 115 .00/per hour <br /> If HAZWOPER CERTIFIED personnel are required there will be a 20 % increase in the Hourly Rate . <br /> r <br /> Gary B . Krick, PSM / President <br /> Date . <br />
The URL can be used to link to this page
Your browser does not support the video tag.