My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-051
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 1:43:27 PM
Creation date
10/1/2015 1:46:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/01/2011
Control Number
2011-051
Agenda Item Number
12.J.1
Entity Name
Beemats LLC
Subject
Floating Mat System
Area
Spoonbill Marsh Wetland Facility
Project Number
2785
Bid Number
2011029
Supplemental fields
SmeadsoftID
9309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01311 <br /> CONSTI,; UCTION SCHEDULES <br /> PART 1 — GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> A . Promptly after award of the Contract, Contractor shall prepare and submit to the Owner <br /> estimated construction progress for the Work, with sub - schedules of related activities <br /> which are essential to its progress . <br /> B . Coordinate the work and scheduling with and around other Contractors and individual <br /> trades performing work on the Project. <br /> C . Submit revised progress schedules with each application for payment . <br /> D . Progress Schedule shall becorne part of Contract Documents after approval by Owner . <br /> 1 . 02 RELATED REQUIREMENTS <br /> A . in other parts of the Contract Documents : <br /> 1 . General Conditions : <br /> a. Articles 2 and 6 — Schedules, Reports, and Records <br /> b . Sections 6 . 01 and 6 . 02 — Supervision by Contractor <br /> C . Article 15 — Supervision of Work, Termination , and Delay <br /> B . Specified in other sections : <br /> I . Summary of Work is included in Section 0 10 10 . <br /> 2 . Submittals is included in Section 01340 . <br /> 1 . 03 FORM OF SCHEDULES <br /> A . Prepare schedules in the form of a horizontal bar chart as follows : <br /> 1 . Provide separate horizontal bar for each trade or operation <br /> 2 . Horizontal time scale : Identify the first work day of each week . <br /> 3 . Scale and spacing : To allow space for notations and future revisions . <br /> 4 . Minimum sheet size : 24 inch by 36 inch <br /> B . Format of listings : The chronological order of the start of each item of work. <br /> C . Identification of listings : By major specification section numbers . <br /> 1 . 04 CONTENT OF SCHEDULES <br /> A . Construction Progress Schedule shall : <br /> 1 . Show the complete sequence of construction by activity . <br /> 2 . Show the dates for the beginning and completion of each major element of <br /> construction . <br /> 3 . Show projected percentage of completion for each item , as of the first day of <br /> each month . <br /> 01311 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.