Laserfiche WebLink
H . If the Contractor considers any correction indicated on the shop drawings to constitute a <br /> change to the Contract Documents, the Contractor shall give written notice thereof to the <br /> Engineer at least 7 working days prior to release for manufacture . <br /> I . When the shop drawings have; been completed to the satisfaction of the Owner, the <br /> Contractor shall carry out the construction in accordance therewith and shall make no <br /> further changes therein except upon written instructions from the Owner . <br /> 1 . 06 DISTRIBUTION <br /> A . Distribute reproductions of approved shop drawings and copies of approved product data <br /> and samples , where required, to the job site file and elsewhere as directed by the Owner . <br /> Number of copies shall be as directed by the Owner but shall not exceed five . <br /> 1 . 07 GENERAL PROCEDURES FOR SUBMITTALS <br /> A . Coordination of Submittal Times : Prepare and transmit each submittal sufficiently in <br /> advance of performing the related work or other applicable activities , or within the time <br /> specified in the individual work of other related Sections, so that the installation will not <br /> be delayed by processing times including disapproval and resubmittal ( if required ) , <br /> coordination with other submittals , testing, purchasing, fabrication , delivery and similar <br /> sequenced activities . No extension of time will be authorized because of the Contractor' s <br /> failure to transmit submittals sufficiently in advance of the Work. <br /> END OF SECTION <br /> 01340- 5 <br />