Laserfiche WebLink
a . Contractor knew of the existence of such d . the safety and protection of all such Under- <br /> conditions at the time Contractor made a final ground Facilities and repairing any damage <br /> commitment to Owner with respect to Contract thereto resulting from the Work . <br /> Price and Contract Times by the submission of a <br /> Bid or becoming bound under a negotiated B . Not Shown or Indicated <br /> contract ; or <br /> 1 . If an Underground Facility is uncovered or <br /> b . the existence of such condition could revealed at or contiguous to the Site which was not <br /> reasonably have been discovered or revealed as a shown or indicated , or not shown or indicated with <br /> result of any examination , investigation , explo- reasonable accuracy in the Contract Documents, <br /> ration , test, or study of the Site and contiguous Contractor shall , promptly after becoming aware <br /> areas required by the Bidding Requirements or thereof and before further disturbing conditions <br /> Contract Documents to be conducted by or for affected thereby or performing any Work in <br /> Contractor prior to Contractor' s making such connection therewith (except in an emergency as <br /> final commitment; or required by Paragraph 6 . 16 . A) , identify the owner of <br /> such Underground Facility and give written notice to <br /> c . Contractor failed to give the written notice as that owner and to Owner and Engineer. Engineer will <br /> required by Paragraph 4 . 03 . A . promptly review the Underground Facility and <br /> determine the extent, if any , to which a change is <br /> 3 --hf Owner-and- C-otttraetor-are-etnable-to agreo- 1 required in the Contract Documents to reflect and <br /> entitlement to or on the amount or extent, ifj;a , of document the consequences of the existence or <br /> any adjustment in the Contract Price of/C;ontract location of the Underground Facility . During such <br /> Times, or both , a Claim may be ma e' therefor as time, Contractor shall be responsible for the safety <br /> provided in Paragraph 10 . 05 . Ho>' ver, Owner and and protection of such Underground Facility . <br /> Engineer, and any of their RO ffed Entities shall not <br /> be liable to Contractor �/any claims , costs , losses, 2 . If Engineer concludes that a change in <br />the <br /> or damages (includin but not limited to all fees and Contract Documents is required , a Work Change <br /> charges of engin s, architects, attorneys, and other Directive or a Change Order will be issued to reflect <br /> professional And all court or arbitration or other and document such consequences . An equitable <br /> dispute olution costs) sustained by Contractor on adjustment shall be made in the Contract Price or <br /> or i onnection with any other project or anticipated Contract Times , or both , to the extent that they are <br /> P o}�ct. attributable to the existence or location of any <br /> Underground Facility that was not shown or indicated <br /> 4 . 04 Underground Facilities or not shown or indicated with reasonable accuracy <br /> in the Contract Documents and that Contractor did <br /> A . Shown or Indicated: The information and data shown not know of and could not reasonably have been <br /> or indicated in the Contract Documents with respect to expected to be aware of or to have anticipated . If <br /> existing Underground Facilities at or contiguous to the Owner and Contractor are unable to agree on <br /> Site is based on information and data furnished to Owner entitlement to or on the amount or extent, if any , of <br /> or Engineer by the owners of such Underground Facili - any such adjustment in Contract Price or Contract <br /> ties, including Owner, or by others . Unless it is otherwise Times , Owner or Contractor may make a Claim <br /> expressly provided in the Supplementary Conditions : therefor as provided in Paragraph 10 . 05 . <br /> 1 . Owner and Engineer shall not be responsible for 4 . 05 Reference Points <br /> the accuracy or completeness of any such information <br /> or data; and A . Owner shall provide engineering surveys to establish <br /> reference points for construction which in Engineer' s <br /> 2 . the cost of all of the following will be included judgment are necessary to enable Contractor to proceed <br /> in the Contract Price, and Contractor shall have full with the Work . Contractor shall be responsible for laying <br /> responsibility for : out the Work , shall protect and preserve the established <br /> reference points and property monuments , and shall make <br /> a . reviewing and checking all such information no changes or relocations without the prior written <br /> and data , approval of Owner. Contractor shall report to Engineer <br /> whenever any reference point or property monument is <br /> b . locating all Underground Facilities shown or lost or destroyed or requires relocation because of <br /> indicated in the Contract Documents, necessary changes in grades or locations, and shall be <br /> responsible for the accurate replacement or relocation of <br /> c . coordination of the Work with the owners of such reference points or property monuments by <br /> such Underground Facilities , including Owner, professionally qualified personnel . <br /> during construction , and <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved . <br /> 00700 - 13 <br />