Laserfiche WebLink
b) whether or not use of the proposed item so proposed or submitted by Contractor, Contractor <br /> substitute item in the Work will require shall reimburse Owner for the charges of Engineer for <br /> a change in any of the Contract Docu - evaluating each such proposed substitute . Contractor shall <br /> ments (or in the provisions of any other also reimburse Owner for the charges of Engineer for <br /> direct contract with Owner for other making changes in the Contract Documents (or in the <br /> work on the Project) to adapt the design provisions of any other direct contract with Owner) <br /> to the proposed substitute item ; and resulting from the acceptance of each proposed substitute . <br /> c) whether or not incorporation or use F . Contractor 's Expense : Contractor shall provide all data <br /> of the proposed substitute item in con - in support of any proposed substitute or " or-equal " at <br /> rection with the Work is subject to Contractor ' s expense . <br /> payment of any license fee or royalty ; <br /> 6 . 06 Concerning Subcontractors, Suppliers, and <br /> 3 ) will identify : Others <br /> a) all variations of the proposed -A--GontraGtor-shall-not ena•pley-any-•Sitbsontra r; <br /> substitute item from that specified , and Supplier, or other individual or entity�kiUing those <br /> acceptable to Owner as indicate itr aragraph 6 . 06 . 13) , <br /> b) available engineering, sales, whether initially or as a r pf�ement, against whom <br /> maintenance , repair, and replacement Owner may have onable objection . Contractor shall <br /> services ; not be require to employ any Subcontractor, Supplier, or <br /> othirt"dividual or entity to furnish or perform any of the <br /> 4) and shall contain an itemized estimate of all 4�otk-aga•instwliorn-Gorrt�astor-4�as-rc�asonabl� ohj@etierr. <br /> costs or credits that will result directly or indi - <br /> rectly from use of such substitute item , including B—litheupplerx�gntary Conditions F�quire the identi <br /> costs of redesign and claims of other contractors of certain Subcontractors , Suppliers , or other indivi ¢6als <br /> affected by any resulting change, or entities to be submitted to Owner in advance <br /> acceptance by Owner by a specified date prior t6 the <br /> B . Substitute Construction Methods or Procedures : If a Effective Date of the Agreement, and i /e ((either <br /> tactor has <br /> specific means , method , technique, sequence , or submitted a list thereof in accordance we Supple- <br /> procedure of construction is expressly required by the mentary Conditions, Owner ' s accepta in <br /> Contract Documents, Contractor may furnish or utilize a writing or by failing to make writte bjection thereto by <br /> substitute means , method , technique, sequence , or the date indicated for acceptance objection in the <br /> procedure of construction approved by Engineer . Bidding Documents or the Con act Documents) of any <br /> Contractor shall submit sufficient information to allow such Subcontractor, Supplieor other individual or entity <br /> Engineer, in Engineer ' s sole discretion , to determine that so identified may be revo ed on the basis of reasonable <br /> the substitute proposed is equivalent to that expressly objection after due my tigation . Contractor shall submit <br /> called for by the Contract Documents . The requirements an acceptable repla0ent for the rejected Subcontractor, <br /> for review by Engineer will be similar to those provided Supplier, or other individual or entity , and the Contract <br /> in Paragraph 6 . 05 . A . 2 . Price will be a other <br /> by the difference in the cost <br /> occasioned, �uch replacement, and an appropriate <br /> C . Engineer 's Evaluation: Engineer will be allowed a Change Oder will be issued . No acceptance by Owner of <br /> reasonable time within which to evaluate each proposal or any su h Subcontractor, Supplier, or other individual or <br /> submittal made pursuant to Paragraphs 6 . 05 . A and 6 . 05 . 13 . entit , whether initially or as a replacement, shall consti - <br /> Engineer may require Contractor to furnish additional tuta waiver of any right of Owner or Engineer to reject <br /> data about the proposed substitute item . Engineer will be ,lfefeetk#e-W rk . <br /> the sole judge of acceptability . No "or equal " or substitute <br /> will be ordered , installed or utilized until Engineer ' s C . Contractor shall be fully responsible to Owner and <br /> review is complete , which will be evidenced by either a. Engineer for all acts and omissions of the Subcontractors, <br /> Change Order for a substitute or an approved Shop Suppliers , and other individuals or entities performing or <br /> Drawing for an "or equal . " Engineer will advise furnishing any of the Work just as Contractor is <br /> Contractor in writing of any negative determination . responsible for Contractor ' s own acts and omissions . <br /> Nothing in the Contract Documents : <br /> D . Special Guarantee: Owner may require Contractor to <br /> furnish at Contractor ' s expense a special performance 1 . shall create for the benefit of any such <br /> guarantee or other surety with respect to any substitute . Subcontractor, Supplier, or other individual or entity <br /> any contractual relationship between Owner or <br /> E . Engineer 's Cost Reimbursement: Engineer will record Engineer and any such Subcontractor, Supplier or <br /> Engineer ' s costs in evaluating a substitute proposed or other individual or entity , nor <br /> submitted by Contractor pursuant to Paragraphs 6 . 05 . A , 2 <br /> and 6 . 05 . 13 Whether or not Engineer approves a substitute <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright (D 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700 - 20 <br />