b) whether or not use of the proposed item so proposed or submitted by Contractor, Contractor
<br /> substitute item in the Work will require shall reimburse Owner for the charges of Engineer for
<br /> a change in any of the Contract Docu - evaluating each such proposed substitute . Contractor shall
<br /> ments (or in the provisions of any other also reimburse Owner for the charges of Engineer for
<br /> direct contract with Owner for other making changes in the Contract Documents (or in the
<br /> work on the Project) to adapt the design provisions of any other direct contract with Owner)
<br /> to the proposed substitute item ; and resulting from the acceptance of each proposed substitute .
<br /> c) whether or not incorporation or use F . Contractor 's Expense : Contractor shall provide all data
<br /> of the proposed substitute item in con - in support of any proposed substitute or " or-equal " at
<br /> rection with the Work is subject to Contractor ' s expense .
<br /> payment of any license fee or royalty ;
<br /> 6 . 06 Concerning Subcontractors, Suppliers, and
<br /> 3 ) will identify : Others
<br /> a) all variations of the proposed -A--GontraGtor-shall-not ena•pley-any-•Sitbsontra r;
<br /> substitute item from that specified , and Supplier, or other individual or entity�kiUing those
<br /> acceptable to Owner as indicate itr aragraph 6 . 06 . 13) ,
<br /> b) available engineering, sales, whether initially or as a r pf�ement, against whom
<br /> maintenance , repair, and replacement Owner may have onable objection . Contractor shall
<br /> services ; not be require to employ any Subcontractor, Supplier, or
<br /> othirt"dividual or entity to furnish or perform any of the
<br /> 4) and shall contain an itemized estimate of all 4�otk-aga•instwliorn-Gorrt�astor-4�as-rc�asonabl� ohj@etierr.
<br /> costs or credits that will result directly or indi -
<br /> rectly from use of such substitute item , including B—litheupplerx�gntary Conditions F�quire the identi
<br /> costs of redesign and claims of other contractors of certain Subcontractors , Suppliers , or other indivi ¢6als
<br /> affected by any resulting change, or entities to be submitted to Owner in advance
<br /> acceptance by Owner by a specified date prior t6 the
<br /> B . Substitute Construction Methods or Procedures : If a Effective Date of the Agreement, and i /e ((either
<br /> tactor has
<br /> specific means , method , technique, sequence , or submitted a list thereof in accordance we Supple-
<br /> procedure of construction is expressly required by the mentary Conditions, Owner ' s accepta in
<br /> Contract Documents, Contractor may furnish or utilize a writing or by failing to make writte bjection thereto by
<br /> substitute means , method , technique, sequence , or the date indicated for acceptance objection in the
<br /> procedure of construction approved by Engineer . Bidding Documents or the Con act Documents) of any
<br /> Contractor shall submit sufficient information to allow such Subcontractor, Supplieor other individual or entity
<br /> Engineer, in Engineer ' s sole discretion , to determine that so identified may be revo ed on the basis of reasonable
<br /> the substitute proposed is equivalent to that expressly objection after due my tigation . Contractor shall submit
<br /> called for by the Contract Documents . The requirements an acceptable repla0ent for the rejected Subcontractor,
<br /> for review by Engineer will be similar to those provided Supplier, or other individual or entity , and the Contract
<br /> in Paragraph 6 . 05 . A . 2 . Price will be a other
<br /> by the difference in the cost
<br /> occasioned, �uch replacement, and an appropriate
<br /> C . Engineer 's Evaluation: Engineer will be allowed a Change Oder will be issued . No acceptance by Owner of
<br /> reasonable time within which to evaluate each proposal or any su h Subcontractor, Supplier, or other individual or
<br /> submittal made pursuant to Paragraphs 6 . 05 . A and 6 . 05 . 13 . entit , whether initially or as a replacement, shall consti -
<br /> Engineer may require Contractor to furnish additional tuta waiver of any right of Owner or Engineer to reject
<br /> data about the proposed substitute item . Engineer will be ,lfefeetk#e-W rk .
<br /> the sole judge of acceptability . No "or equal " or substitute
<br /> will be ordered , installed or utilized until Engineer ' s C . Contractor shall be fully responsible to Owner and
<br /> review is complete , which will be evidenced by either a. Engineer for all acts and omissions of the Subcontractors,
<br /> Change Order for a substitute or an approved Shop Suppliers , and other individuals or entities performing or
<br /> Drawing for an "or equal . " Engineer will advise furnishing any of the Work just as Contractor is
<br /> Contractor in writing of any negative determination . responsible for Contractor ' s own acts and omissions .
<br /> Nothing in the Contract Documents :
<br /> D . Special Guarantee: Owner may require Contractor to
<br /> furnish at Contractor ' s expense a special performance 1 . shall create for the benefit of any such
<br /> guarantee or other surety with respect to any substitute . Subcontractor, Supplier, or other individual or entity
<br /> any contractual relationship between Owner or
<br /> E . Engineer 's Cost Reimbursement: Engineer will record Engineer and any such Subcontractor, Supplier or
<br /> Engineer ' s costs in evaluating a substitute proposed or other individual or entity , nor
<br /> submitted by Contractor pursuant to Paragraphs 6 . 05 . A , 2
<br /> and 6 . 05 . 13 Whether or not Engineer approves a substitute
<br /> EJCDC C-700 Standard General Conditions of the Construction Contract.
<br /> Copyright (D 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
<br /> 00700 - 20
<br />
|