entitlement to or on the amount or extent, if any , of any Work Contractor shall remove from the Site all tools ,
<br /> such adjustment, a Claim maybe made therefor as appliances, construction equipment and machinery , and
<br /> provided in Paragraph 10 . 05 . surplus materials and shall restore to original condition all
<br /> property not designated for alteration by the Contract
<br /> 6 . 10 Taxes Documents .
<br /> A . Contractor shall pay all sales, consumer, use, and other D . Loading Structures: Contractor shall not load nor
<br /> similar taxes required to be paid by Contractor in permit any part of any structure to be loaded in any
<br /> accordance with the Laws and Regulations of the place of manner that will endanger the structure, nor shall
<br /> the Project which are applicable during the performance Contractor subject any part of the Work or adjacent
<br /> of the Work . property to stresses or pressures that will endanger it.
<br /> 6 . 11 Use of Site and Other Areas 6 . 12 Record Documents
<br /> A . Limitation on Use of Site and Other Areas A . Contractor shall maintain in a safe place at the Site
<br /> one record copy of all Drawings, Specifications ,
<br /> 1 . Contractor shall confine construction equipment, Addenda, Change Orders, Work Change Directives , Field
<br /> the storage of materials and equipment, and the Orders , and written interpretations and clarifications in
<br /> operations of workers to the Site and other areas good order and annotated to show changes made during
<br /> permitted by Laws and Regulations, and shall not construction . These record documents together with all
<br /> unreasonably encumber the Site and other areas with approved Samples and a counterpart of all approved Shop
<br /> construction equipment or other materials or Drawings will be available to Engineer for reference.
<br /> equipment. Contractor shall assume full Upon completion of the Work, these record documents,
<br /> responsibility for any damage to any such land or Samples , and Shop Drawings will be delivered to Engi -
<br /> area, or to the owner or occupant thereof, or of any neer for Owner.
<br /> adjacent land or areas resulting from the performance
<br /> of the Work . 6 . 13 Safety and Protection
<br /> 2 . Should any claim be made by any such owner or A . Contractor shall be solely responsible for initiating,
<br /> occupant because of the performance of the Work, maintaining and supervising all safety precautions and
<br /> Contractor shall promptly settle with such other party programs in connection with the Work . Contractor shall
<br /> by negotiation or otherwise resolve the claim by take all necessary precautions for the safety of, and shall
<br /> arbitration or other dispute resolution proceeding or provide the necessary protection to prevent damage,
<br /> at law . injury or loss to :
<br /> 3 . To the fullest extent permitted by Laws .and I . all persons on the Site or who may be affected by
<br /> Regulations , Contractor shall indemnify and hold the Work;
<br /> harmless Owner and Engineer, and the officers,
<br /> directors, partners , employees, agents , consultants 2 . all the Work and materials and equipment to be
<br /> and subcontractors of each and any of them from and incorporated therein , whether in storage on or off the
<br /> against all claims , costs, losses, and damages Site ; and
<br /> (including but not limited to all fees and charges of
<br /> engineers, architects, attorneys, and other 3 . other property at the Site or adjacent thereto,
<br /> professionals and all court or- "a+13-4-a4en or other including trees , shrubs, lawns, walks, pavements,
<br /> dispute resolution costs) arising out of or relating, to roadways, structures, utilities, and Underground
<br /> any claim or action , legal or equitable , brought by Facilities not designated for removal , relocation , or
<br /> any such owner or occupant against Owner, replacement in the course of construction .
<br /> Engineer, or any other party indemnified hereunder
<br /> to the extent caused by or based upon Contractor's B . Contractor shall comply with all applicable Laws and
<br /> performance of the Work . Regulations relating to the safety of persons or property,
<br /> or to the protection of persons or property from damage,
<br /> B . Removal of Debris During Performance of the Work: injury , or loss ; and shall erect and maintain all necessary
<br /> During the progress of the Work Contractor shall keep the safeguards for such safety and protection . Contractor shall
<br /> Site and other areas free from accumulations of waste notify owners of adjacent property and of Underground
<br /> materials, rubbish , and other debris . Removal and Facilities and other utility owners when prosecution of the
<br /> disposal of such waste materials , rubbish , and other debris Work may affect them , and shall cooperate with them in
<br /> shall conform to applicable Laws and Regulations . the protection , removal , relocation , and replacement of
<br /> their property .
<br /> C . Cleaning: Prior to Substantial Completion of the Work
<br /> Contractor shall clean the Site and the Work and make it C . All damage, injury, or loss to any property referred to
<br /> ready for utilization by Owner. At the completion of the in Paragraph 6 . 13 . A . 2 or 6 . 13 .A .3 caused , directly or
<br /> EJCDC C-700 Standard General Conditions of the Construction Contract.
<br /> Copyright 0 2002 National Society of Professional Engineers for EJCDC. All rights reserved .
<br /> 00700 - 22
<br />
|