Laserfiche WebLink
entitlement to or on the amount or extent, if any , of any Work Contractor shall remove from the Site all tools , <br /> such adjustment, a Claim maybe made therefor as appliances, construction equipment and machinery , and <br /> provided in Paragraph 10 . 05 . surplus materials and shall restore to original condition all <br /> property not designated for alteration by the Contract <br /> 6 . 10 Taxes Documents . <br /> A . Contractor shall pay all sales, consumer, use, and other D . Loading Structures: Contractor shall not load nor <br /> similar taxes required to be paid by Contractor in permit any part of any structure to be loaded in any <br /> accordance with the Laws and Regulations of the place of manner that will endanger the structure, nor shall <br /> the Project which are applicable during the performance Contractor subject any part of the Work or adjacent <br /> of the Work . property to stresses or pressures that will endanger it. <br /> 6 . 11 Use of Site and Other Areas 6 . 12 Record Documents <br /> A . Limitation on Use of Site and Other Areas A . Contractor shall maintain in a safe place at the Site <br /> one record copy of all Drawings, Specifications , <br /> 1 . Contractor shall confine construction equipment, Addenda, Change Orders, Work Change Directives , Field <br /> the storage of materials and equipment, and the Orders , and written interpretations and clarifications in <br /> operations of workers to the Site and other areas good order and annotated to show changes made during <br /> permitted by Laws and Regulations, and shall not construction . These record documents together with all <br /> unreasonably encumber the Site and other areas with approved Samples and a counterpart of all approved Shop <br /> construction equipment or other materials or Drawings will be available to Engineer for reference. <br /> equipment. Contractor shall assume full Upon completion of the Work, these record documents, <br /> responsibility for any damage to any such land or Samples , and Shop Drawings will be delivered to Engi - <br /> area, or to the owner or occupant thereof, or of any neer for Owner. <br /> adjacent land or areas resulting from the performance <br /> of the Work . 6 . 13 Safety and Protection <br /> 2 . Should any claim be made by any such owner or A . Contractor shall be solely responsible for initiating, <br /> occupant because of the performance of the Work, maintaining and supervising all safety precautions and <br /> Contractor shall promptly settle with such other party programs in connection with the Work . Contractor shall <br /> by negotiation or otherwise resolve the claim by take all necessary precautions for the safety of, and shall <br /> arbitration or other dispute resolution proceeding or provide the necessary protection to prevent damage, <br /> at law . injury or loss to : <br /> 3 . To the fullest extent permitted by Laws .and I . all persons on the Site or who may be affected by <br /> Regulations , Contractor shall indemnify and hold the Work; <br /> harmless Owner and Engineer, and the officers, <br /> directors, partners , employees, agents , consultants 2 . all the Work and materials and equipment to be <br /> and subcontractors of each and any of them from and incorporated therein , whether in storage on or off the <br /> against all claims , costs, losses, and damages Site ; and <br /> (including but not limited to all fees and charges of <br /> engineers, architects, attorneys, and other 3 . other property at the Site or adjacent thereto, <br /> professionals and all court or- "a+13-4-a4en or other including trees , shrubs, lawns, walks, pavements, <br /> dispute resolution costs) arising out of or relating, to roadways, structures, utilities, and Underground <br /> any claim or action , legal or equitable , brought by Facilities not designated for removal , relocation , or <br /> any such owner or occupant against Owner, replacement in the course of construction . <br /> Engineer, or any other party indemnified hereunder <br /> to the extent caused by or based upon Contractor's B . Contractor shall comply with all applicable Laws and <br /> performance of the Work . Regulations relating to the safety of persons or property, <br /> or to the protection of persons or property from damage, <br /> B . Removal of Debris During Performance of the Work: injury , or loss ; and shall erect and maintain all necessary <br /> During the progress of the Work Contractor shall keep the safeguards for such safety and protection . Contractor shall <br /> Site and other areas free from accumulations of waste notify owners of adjacent property and of Underground <br /> materials, rubbish , and other debris . Removal and Facilities and other utility owners when prosecution of the <br /> disposal of such waste materials , rubbish , and other debris Work may affect them , and shall cooperate with them in <br /> shall conform to applicable Laws and Regulations . the protection , removal , relocation , and replacement of <br /> their property . <br /> C . Cleaning: Prior to Substantial Completion of the Work <br /> Contractor shall clean the Site and the Work and make it C . All damage, injury, or loss to any property referred to <br /> ready for utilization by Owner. At the completion of the in Paragraph 6 . 13 . A . 2 or 6 . 13 .A .3 caused , directly or <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright 0 2002 National Society of Professional Engineers for EJCDC. All rights reserved . <br /> 00700 - 22 <br />