My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-051
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 1:43:27 PM
Creation date
10/1/2015 1:46:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/01/2011
Control Number
2011-051
Agenda Item Number
12.J.1
Entity Name
Beemats LLC
Subject
Floating Mat System
Area
Spoonbill Marsh Wetland Facility
Project Number
2785
Bid Number
2011029
Supplemental fields
SmeadsoftID
9309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
requirements of the Work and the Contract revisions other than the corrections called for <br />by <br /> Documents . Engineer on previous submittals . <br /> 2 . Each submittal shall bear a stamp or specific 6 . 18 Continuing the Work <br /> written certification that Contractor has satisfied <br /> Contractor ' s obligations under the Contract A . Contractor shall carry on the Work and adhere to the <br /> Documents with respect to Contractor' s review and Progress Schedule during all disputes or disagreements <br /> approval of that submittal . with Owner. No Work shall be delayed or postponed <br /> pending resolution of any disputes or disagreements , <br /> 3 . With each submittal , Contractor shall give except as pennitted by Paragraph 15 . 04 or as Owner and <br /> Engineer specific written notice of any variations , Contractor may otherwise agree in writing . <br /> that the Shop Drawing or Sample may have from the <br /> requirements of the Contract Documents . This notice 6 . 19 Contractor 's General Warranty and Guarantee <br /> shall be both a written communication separate from <br /> the Shop Drawing ' s or Sample Submittal ; and , in Q r'nntrartoc..warrantsand-guar-anteo&-te-Owner-tha -a6F <br /> addition , by a specific notation made on each Shop Work will be in accordance with the C tact olTc II'Ls <br /> Drawing or Sample submitted to Engineer for review and will not be defective ngiTreer and its Related <br /> and approval of each such variation . Entities sh b nItled to rely on representation of <br /> . raetor-' s-wat�anty-ftnd-guarantee. <br /> D . Engineer ' s Review <br /> B . Contractor ' s warranty and guarantee hereunder <br /> 1 . Engineer will provide timely review of Shop excludes defects or damage caused by : <br /> Drawings and Samples in accordance with the Sched - <br /> ule of Submittals acceptable to Engineer. Engineer ' s 1 . abuse, modification , or improper maintenance or <br /> review and approval will be only to determine if the operation by persons other than Contractor, Sub- <br /> items covered by the submittals will , after installation contractors, Suppliers , or any other individual or <br /> or incorporation in the Work, conform to the entity for whom Contractor is responsible ; or <br /> information given in the Contract Documents and be <br /> compatible with the design concept of the completed 2 . normal wear and tear under normal usage . <br /> Project as a functioning whole as indicated by the <br /> Contract Documents . C . Contractor ' s obligation to perform and complete the <br /> Work in accordance with the Contract Documents shall be <br /> 2 . Engineer ' s review and approval will not extend absolute . None of the following will constitute an <br /> to means , methods, techniques, sequences, or acceptance of Work that is not in accordance with the <br /> procedures of construction (except where a particular Contract Documents or a release of Contractor' s <br /> means, method , technique, sequence, or procedure of obligation to perform the Work in accordance with the <br /> construction is specifically and expressly called for Contract Documents : <br /> by the Contract Documents) or to safety precautions <br /> or programs incident thereto . The review and I . observations by Engineer; <br /> approval of a separate item as such will not indicate <br /> approval of the assembly in which the item functions . 2 . recommendation by Engineer or payment by <br /> 3 . Engineer ' s review and approval shall not relieve Owner of any progress or final payment ; <br /> Contractor from responsibility for any variation from 3 . the issuance of a certificate of Substantial <br /> the requirements of the Contract Documents unless Completion by Engineer or any payment related <br /> Contractor has complied with the requirements of thereto by Owner; <br /> Paragraph 6 . 17 . C . 3 and Engineer has given written <br /> approval of each such variation by specific written 4 . use or occupancy of the Work or any part thereof <br /> notation thereof incorporated in or accompanying the by Owner; <br /> Shop Drawing or Sample . Engineer' s review and <br /> approval shall not relieve Contractor from 5 . any review and approval of a Shop Drawing or <br /> responsibility for complying with the requirements of Sample submittal or the issuance of a notice of <br /> Paragraph 6 . 17 . C . 1 . acceptability by Engineer; <br /> E . Resubmittal Procedures 6 . any inspection , test, or approval by others ; or <br /> 1 . Contractor shall make corrections required by 7 . any correction of defective Work by Owner. <br /> Engineer and shall return the required number of cor- <br /> rected copies of Shop Drawings and submit, as <br /> required , new Samples for review and approval . <br /> Contractor shall direct specific attention in writing to <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright D 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700 - 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.