Laserfiche WebLink
tests, or approvals required by the Contract Documents <br /> C—hf-it is-fbuttd-thrat-tlae-un �ower�d-World d�€��ta <br /> except : Contractor shall pay all claims , costs , losses , a�n damages <br /> 1 . for inspections , tests, or approvals covered b ( including but not limited to all fees and ch�i'ges of <br /> y eng <br /> Paragraphs 13 . 03 . 0 and 13 . 03 . D below ; and all court or arbitration or other diineers, architects , attorneys , and othe�r'professiona <br />ls <br /> ' pute resolution <br /> costs) arising out of or relating to s ich uncovering, <br /> 2 . that costs incurred in connection with tests or exposure, observation , inspection , and testing, and of <br /> inspections conducted pursuant to Paragraph 13 . 04 . 13 satisfactory replacem.,pnr reconstruction ( including but <br /> shall be paid as provided in said Paragraph 13 . 04 . C ; not limited to all. dts of repair or replacement of work <br /> of <br /> and others) ; and Owner shall be entitled to an appropriate <br /> e Contract Price . If the parties are <br /> ble to <br /> 3 . as otherwise specifically provided in the Con - agneas is to the amount thereof, Owner may make aaCla m <br /> tract Documents . t erlf �fo�as-pr•Puidod-in-Para. ra 1x1.0-0� . <br /> g p <br /> C . If Laws or Regulations of any public body having D:-l-f;the-uneovered� W-ork-is-not-found-to-be def@cti�, <br /> jurisdiction require any Work ( or part thereof) specifically Contractor shall be allowed an increase in the Contract <br /> to be inspected , tested , or approved by an employee or Price or an extension of the Contract Timt�s, or both, <br /> other representative of such public body, Contractor shall directly attributable to such uu cog, exposure, <br /> assume full responsibility for arranging and obtaining observation , inspect on,-t sting, replacement, and <br /> such inspections, tests, or approvals, pay all costs in reconstruction ,.l•fit1 e parties are unable to agree as to the <br /> connection therewith, and furnish Engineer the required amounLor extent thereof, Contractor may make a Claim <br /> certificates of inspection or approval . <br /> there effor as-provided=in-Paragraph-1.0:05. <br /> D . Contractor shall be responsible for arranging and 13 . 05 Owner May Stop the Work <br /> obtaining and shall pay all costs in connection with ani <br /> y <br /> inspections , tests, or approvals required for Owner' s and A . If the Work is defective, or Contractor fails to supply <br /> Engineer' s acceptance of materials or equipment to be sufficient skilled workers or suitable materials or <br /> incorporated in the Work; or acceptance of materials, mix equipment, or fails to perform the Work in such a way <br /> designs , or equipment submitted for approval prior to that the completed Work will conform to the Contract <br /> Contractor ' s purchase thereof for incorporation in the Documents, Owner may order Contractor to stop the <br /> Work. Such inspections , tests , or approvals shall be Work, or any portion thereof, until the cause for such <br /> performed by organizations acceptable to Owner and order has been eliminated ; however, this right of Owner <br /> Engineer. to stop the Work shall not give rise to any duty on the part <br /> of Owner to exercise this right for the benefit of <br /> E . If any Work (or the work of others) that is to be Contractor, any Subcontractor, any Supplier, any other <br /> inspected , tested , or approved is covered by Contractor individual or entity, or any surety for, or employee or <br /> without written concurrence of Engineer, it must, if agent of any of them . <br /> requested by Engineer, be uncovered for observation . <br /> F . Uncovering Work as provided in Paragraph 13 . 03 . E 13 . 06 Correction or Removal of Defective Work <br /> shall be at Contractor ' s expense unless Contractor has A . Promptly after receipt of notice, Contractor shall <br /> given Engineer timely notice of Contractor ' s intention to correct all defective Work, whether or not fabricated , <br /> cover the same and Engineer has not acted with installed , or completed , or, if the Work has been rejected <br /> reasonable promptness in response to such notice . by Engineer, remove it from the Project and replace it <br /> with Work that is not defective . Contractor shall pay all <br /> 13 . 04 Uncovering Work claims, costs , losses, and damages (including but not <br /> limited to all fees and charges of engineers, architects , <br /> A . If any Work is covered contrary to the written request attorneys, and other professionals and all court or- <br /> of Engineer, it must, if requested by Engineer, be -arbitration or other dispute resolution costs) arising out of <br /> uncovered for Engineer ' s observation and replaced at or relating to such correction or removal (including but <br /> Contractor' s expense . not limited to all costs of repair or replacement of work of <br /> others) . <br /> B . If Engineer considers it necessary or advisable that <br /> covered Work be observed by Engineer or inspected or B . When correcting defective Work under the terms of <br /> tested by others, Contractor, at Engineer ' s request, shall this Paragraph 13 . 06 or Paragraph 13 . 07 , Contractor shall <br /> uncover, expose , or otherwise make available for take no action that would void or otherwise impair <br /> observation , inspection, or testing as Engineer may Owner ' s special warranty and guarantee , if any, on said <br /> require, that portion of the Work in question , fumishing Work . <br /> all necessary labor, material , and equipment. <br /> 13 . 07 Correction Period <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved . <br /> 00700 - 34 <br />