It is understood that CONTRACTOR has included in the Contract Price all allowances so named in the Contract <br /> Documents and shall cause the Work so covered to be performed for such sums as maybe acceptable to OWNER. <br /> Delete paragraphs 11 . 02B through D of the General Conditions in their entirety. <br /> ARTICLE 12 - CHANGE OF CONTRACT PRICE ; CHANGE OF CONTRACT TIMES <br /> SC 12 . 01A . Delete paragraph 12 . 01A of the General Conditions in its entirety and replace with the following : <br /> The Contract Price may only be changed by a Change Order or by a Written Amendment. Any Claim for an <br /> adjustment in the Contract Price shall be based on written notice in accordance with the provisions of paragraph <br /> 10 . 05 . <br /> SC 12 . 01132 . Delete paragraph 12 . 01132 of the General Conditions in its entirety and replace with the following : <br /> 2 . where the Work involved is not covered by unit prices contained in the Contract Documents , by a mutually <br /> agreed lump sum . <br /> SC 12 . 01133 . Delete paragraph 12 . 01133 of the General Conditions in its entirety . <br /> SC 12 . 01 C . Delete paragraph 12 . 01 C of the General Conditions in its entirety . <br /> 12 . 03A and B . Delete paragraphs 12 . 03 . A and .12 . 0313 of the General Conditions in their entirety and replace <br /> with the following : <br /> A . Where Contractor is delayed or prevented from completing any part of the Work within the Contract Times <br /> due to delay beyond the control of Contractor, the Contract Times (or Milestones) will be extended in an amount <br /> equal to the time lost due to such delay ifs a Claim is made therefore as provided in paragraph 12 . 02 . A and (2 ) <br /> Contractor provides evidence that the delay impacted the critical path of the Project. Delays beyond the control of <br /> Contractor shall include , but not be limited to , acts or neglect by Owner, acts or neglect of utility owners or other <br /> contractors performing other work as contemplated by Article 7 , fires , floods, abnormal weather conditions or acts <br /> of God . The Contractor must request the extension, of time in writing and must provide the following information <br /> within the time periods stated hereafter. Failure to submit such information and in compliance with the time <br /> requirements hereinafter stated, shall constitute a waiver by the Contractor and a denial of the claim for extension <br /> of time : <br /> 1 . Nature of the delay or change in the Work ; <br /> 2 . Dates of commencement and cessation of the delay or change in the Work ; <br /> 3 . Activities on the current progress schedule affected by the delay or change in the Work ; <br /> 4 . Identification and demonstration that the delay or change in Work affects the critical path ; <br /> 5 . Identification of the source of delay or change in the Work; <br /> 6 . Anticipated extent of the delay or change in the Work ; and <br /> 7 . Recommended action to minimize the delay . <br /> B . Contractor hereby affirms that the extension of time granted herein is the Contractor's sole and exclusive <br /> remedy. Apart from extension of time , no payment or claim for damages shall be made to the Contractor as <br /> compensation for damages for any delays or hindrances from any cause whatsoever in the progress of the Work <br /> whether such delay is avoidable or unavoidable . <br /> SC 12 . 03C . Delete paragraph 12 . 03 . 0 of the General Conditions in its entirety . <br /> SC 12 . 03D . Delete paragraph 12 . 03D of the General Conditions in its entirety and replace with the following : <br /> 00800 - 12 <br />