My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-137
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 11:07:57 AM
Creation date
10/1/2015 2:15:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/01/2010
Control Number
2010-137
Agenda Item Number
8.N.
Entity Name
SPS Contracting, Inc.
Subject
58th Avenue Roadway Modifications
Area
58th Avenue
Project Number
0550
Bid Number
2010034
Supplemental fields
SmeadsoftID
9701
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
discrepancy which CONTRACTOR may discover and <br /> shall obtain a written interpretation or clarification from 2 . 07 Initial Acceptance of Schedules <br /> ENGINEER before proceeding with any Work affected <br /> thereby; however, CONTRACTOR shall not be liable A. Unless otherwise provided in the Contract <br /> to OWNER or ENGINEER for failure to report any Documents , at least ten days before submission of the <br /> conflict, error, ambiguity, or discrepancy in the first Application for Payment a conference attended by <br /> Contract Documents unless CONTRACTOR knew or CONTRACTOR, ENGINEER, and others as appropri- <br /> reasonably should have known thereof. ate will be held to review for acceptability to ENGI - <br /> NEER as provided below the schedules submitted in <br /> B . Preliminary Schedules: Within ten days after accordance with paragraph 2 . 05 . B . CONTRACTOR <br /> the Effective Date of the Agreement (unless otherwise shall have an additional ten days to make corrections <br /> specified in the General Requirements ) , CONTRAC- and adjustments and to complete and resubmit the <br /> TOR shall submit to ENGINEER for its timely review : schedules . No progress payment shall be made to <br /> CONTRACTOR until acceptable schedules are <br /> 1 . a preliminary progress schedule submitted to ENGINEER . <br /> indicating the times (numbers of days or dates ) <br /> for starting and completing the various stages 1 . The progress schedule will be <br /> of the Work , including any Milestones specified acceptable to ENGINEER if it provides an <br /> in the Contract Documents ; orderly progression of the Work to completion <br /> within any specified Milestones and the <br /> 2 . a preliminary schedule of Shop Contract Times . Such acceptance will not <br /> Drawing and Sample submittals which will list impose on ENGINEER responsibility for the <br /> each required submittal and the times for sub- progress schedule , for sequencing , scheduling , <br /> mitting , reviewing , and processing such or progress of the Work nor interfere with or <br /> submittal ; and relieve CONTRACTOR from CONTRACTOR's <br /> full responsibility therefor . <br /> 3 . a preliminary schedule of values for <br /> all of the Work which includes quantities and 2 . CONTRACTOR's schedule of Shop <br /> prices of items which when added together Drawing and Sample submittals will be <br /> equal the Contract Price and subdivides the acceptable to ENGINEER if it provides a <br /> Work into component parts in sufficient detail to workable arrangement for reviewing and <br /> serve as the basis for progress payments processing the required submittals . <br /> during performance of the Work . Such prices <br /> will include an appropriate amount of overhead 3 . CONTRACTOR's schedule of values <br /> and profit applicable to each item of Work . will be acceptable to ENGINEER as to form <br /> and substance if it provides a reasonable <br /> ww <br /> allocation of the Contract Price to component <br /> the Site is started , CONTRACTOR and OWN E all parts of the Work . <br /> each deliver to the other, with cop o each <br /> additional insured identified in t upplementary ARTICLE 3 - CONTRACT DOCUMENTS : INTENT , <br /> Conditions , certificates of urance (and other AMENDING , REUSE <br /> evidence of insurance ich either of them or any <br /> additional insur , may reasonably request) which <br /> CONTRA and OWNER respectively are 3 . 01 Intent <br /> A . The Contract Documents are comple- <br /> mentary; what is called for by one is as binding as if <br /> 2 . 06 Preconstruction Conference called for by all . <br /> B . It is the intent of the Contract Documents to <br /> to run , but before any Work at the Site i arted , a describe a functionally complete Project (or part there- <br /> conference attended by CONTRACT ENGINEER, of) to be constructed in accordance with the Contract <br /> and others as appropriate wil held to establish a Documents . Any labor, documentation , services , <br /> materials , or equipment that may reasonably be <br /> Work and to discLU a schedules referred to in para- inferred from the Contract Documents or from <br /> graph 2 . 05 rocedures for handling Shop Drawings prevailing custom or trade usage as being required to <br /> and er submittals , processing Applications for produce the intended result will be provided whether <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 9 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0550 SR60&58th Ave Intersection Improvements (KHA)\Admim\Bid Documents\00700 - General Conditions REV 04-07 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.