Laserfiche WebLink
locations , and shall be responsible for the accurate <br /> 1 . If an Underground Facility is replacement or relocation of such reference points or <br /> uncovered or revealed at or contiguous to the property monuments by professionally qualified <br /> Site which was not shown or indicated , or not personnel . <br /> shown or indicated with reasonable accuracy in <br /> the Contract Documents , CONTRACTOR shall , 4 . 06 Hazardous Environmental Condition at Site <br /> promptly after becoming aware thereof and <br /> before further disturbing conditions affected A. Reports and Drawings: Reference is made to <br /> thereby or performing any Work in connection the Supplementary Conditions for the identification of <br /> therewith (except in an emergency as required those reports and drawings relating to a Hazardous <br /> by paragraph 6 . 16 .A) , identify the owner of Environmental Condition identified at the Site , if any, <br /> such Underground Facility and give written that have been utilized by the ENGINEER in the <br /> notice to that owner and to OWNER and ENGI - preparation of the Contract Documents . <br /> NEER . ENGINEER will promptly review the <br /> Underground Facility and determine the extent, B . Limited Reliance by CONTRACTOR on <br /> if any, to which a change is required in the Technical Data Authorized. CONTRACTOR may rely <br /> Contract Documents to reflect and document upon the general accuracy of the "technical data" <br /> the consequences of the existence or location contained in such reports and drawings , but such <br /> of the Underground Facility. During such time , reports and drawings are not Contract Documents . <br /> CONTRACTOR shall be responsible for the Such "technical data" is identified in the <br /> safety and protection of such Underground Supplementary Conditions . Except for such reliance <br /> Facility. on such "technical data ," CONTRACTOR may not rely <br /> upon or make any Claim against OWNER, <br /> 2 . If ENGINEER concludes that a ENGINEER or any of ENGINEER's Consultants with <br /> change in the Contract Documents is required , respect to : <br /> a Work Change Directive or a Change Order <br /> will be issued to reflect and document such 1 . the completeness of such reports <br /> consequences . An equitable adjustment shall and drawings for CONTRACTOR's purposes , <br /> be made in the Contract Price or Contract including , but not limited to , any aspects of the <br /> Times , or both , to the extent that they are means , methods , techniques , sequences and <br /> attributable to the existence or location of any procedures of construction to be employed by <br /> Underground Facility that was not shown or CONTRACTOR and safety precautions and <br /> indicated or not shown or indicated with programs incident thereto ; or <br /> reasonable accuracy in the Contract <br /> Documents and that CONTRACTOR did not 2 . other data , interpretations , opinions <br /> know of and could not reasonably have been and information contained in such reports or <br /> expected to be aware of or to have anticipated . shown or indicated in such drawings ; or <br /> If OWNER and CONTRACTOR are unable to <br /> agree on entitlement to or on the amount or 3 . any CONTRACTOR interpretation of <br /> extent , if any, of any such adjustment in or conclusion drawn from any "technical data" <br /> Contract Price or Contract Times , OWNER or or any such other data , interpretations , opinions <br /> CONTRACTOR may make a Claim therefor as or information . <br /> provided in paragraph 10 . 05 . <br /> C . CONTRACTOR shall not be responsible for <br /> 4 . 05 Reference Points any Hazardous Environmental Condition uncovered or <br /> revealed at the Site which was not shown or indicated <br /> A. OWNER shall provide engineering surveys to in Drawings or Specifications or identified in the <br /> establish reference points for construction which in Contract Documents to be within the scope of <br /> the <br /> ENGINEER's judgment are necessary to enable Work. CONTRACTOR shall be responsible for a <br /> CONTRACTOR to proceed with the Work . CON - Hazardous Environmental Condition created with any <br /> TRACTOR shall be responsible for laying out the materials brought to the Site by CONTRACTOR, <br /> Work , shall protect and preserve the established Subcontractors , Suppliers , or anyone else for whom <br /> reference points and property monuments , and shall CONTRACTOR is responsible . <br /> make no changes or relocations without the prior <br /> written approval of OWNER. CONTRACTOR shall D . If CONTRACTOR encounters a Hazardous <br /> report to ENGINEER whenever any reference point or Environmental Condition or if CONTRACTOR or <br /> property monument is lost or destroyed or requires anyone for whom CONTRACTOR is responsible <br /> relocation because of necessary changes in grades or creates a Hazardous Environmental Condition , <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 13 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0550 SR60&58th Ave Intersection Improvements (KHA)\Admim\Bid Documents\00700 - General Conditions REV 04-07.doc <br />