My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-137
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 11:07:57 AM
Creation date
10/1/2015 2:15:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/01/2010
Control Number
2010-137
Agenda Item Number
8.N.
Entity Name
SPS Contracting, Inc.
Subject
58th Avenue Roadway Modifications
Area
58th Avenue
Project Number
0550
Bid Number
2010034
Supplemental fields
SmeadsoftID
9701
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 . 08 Receipt and Application of Insurance <br /> Proceeds <br /> 5 . 10 Partial Utilization, Acknowledgment of <br /> 'aRGe required by paragF@ph 5 . 0- 6 1.4.411 'he, adjusted Property Insurer <br /> with 9WN € R and made--Parable to OWNER as <br /> A. If OWNER finds it necessary to occupy or use <br /> a portion or portions of the Work prior to Substantial <br /> Completion of all the Work as provided in paragraph <br /> 14 . 05 , no such use or occupancy shall commence <br /> before the insurers providing the property insurance <br /> pursuant to paragraph 5 . 06 have acknowledged notice <br /> ether-special agreement is reaehed , the-damaged thereof and in writing effected any changes in cover- <br /> age necessitated thereby. The insurers providing the <br /> Yed applied thereef, and the Work property insurance shall consent by endorsement on <br /> the policy or policies , but the property insurance shall <br /> not be canceled or permitted to lapse on account of <br /> any such partial use or occupancy. <br /> B . 9WN€ R as fidusiar-r-shall--have--Po .. er --te <br /> adjust and settle any less with the in c „ nle E) Re. <br /> ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br /> days after the essurrense of- lessto OWN€R 's <br /> 6 . 01 Supervision and Superintendence <br /> Parties in interest-ma;read-l#n sue„"-agreeMeRt A. CONTRACTOR shall supervise , inspect, and <br /> umnnn the parties iR interest is reaGherl OWNER as. direct the Work competently and efficiently, devoting <br /> fiddoiary shall adjyst and settle"„o-:evs with the. such attention thereto and applying such skills <br />and <br /> expertise as may be necessary to perform the Work in <br /> accordance with the Contract Documents . CON - <br /> proper PeFfOFMaRGG Of 66IGh duties . shall be solely responsible for the means , <br /> methods , techniques , sequences , and procedures of <br /> 5 . 09 Acceptance of Bonds and Insurance; Option construction , but CONTRACTOR shall not be <br /> to Replace responsible for the negligence of OWNER or <br /> ENGINEER in the design or specification of a specific <br /> A. If P *thpr OVINFR or CONTRACTOR has 2R� ' means , method , technique , sequence , or procedure of <br /> %fien to the. n. eveFage afforded by er other construction which is shown or indicated in and <br /> expressly required by the Contract Documents . CON - <br /> TRACTOR shall be responsible to see that the <br /> completed Work complies accurately with the Contract <br /> Documents . <br /> 69 notify the otheF party on writing within 10 days afte <br /> reeeipt of the sertifisates--(er etheF e%deRGe B . At all times during the progress of the Work , <br /> requested ) required by paragraph 2 .05 -CANNIER CONTRACTOR shall assign a competent resident <br /> superintendent thereto who shall not be replaced <br /> without written notice to OWNER and ENGINEER <br /> Pr O�Ided as the ether M@Y reasenabl;request . 1# except under extraordinary circumstances . The <br /> superintendent will be CONTRACTOR's <br /> representative at the Site and shall have authority to <br /> act on behalf of CONTRACTOR . All communications <br /> given to or received from the superintendent shall be <br /> binding on CONTRACTOR . <br /> aRY change OR the required coverage . Without <br /> PFE�UdiGe to aRy ether Fight eF Femedy, the other pa 6 . 02 Labor; Working Hours <br /> nrnteGt SUGh other party's interoct. ;at the expense et A. CONTRACTOR shall provide competent , <br /> lily li„ JV�. I <br /> the party who was required tG provide SUGh GGVeFag8 , <br /> suitably qualified personnel to survey, lay out , and <br /> construct the Work as required by the Contract Docu - <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 18 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0550 SR60&58th Ave Intersection Improvements ( KHA)\Admim\Bid Documents\00700 - General Conditions REV 04-07 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.