My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-279
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 10:07:58 AM
Creation date
10/1/2015 2:33:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
11/02/2010
Control Number
2010-279
Agenda Item Number
8.S.2
Entity Name
Stanley Consultants,Inc.
Subject
Roadway Final Design and Plans Stoney Point Drive
Area
CR 510 from CR 512 to east of 75th Court
Supplemental fields
SmeadsoftID
9867
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br /> AMENDMENT 6 xp .. a 77 <br /> FINAL DESIGN AND PLANS PREPARATION FOR <br /> CR 510 from CR 512 to east of 75 '" Court <br /> This is an amendment to the existing Final Design and Plans Preparation services agreement <br /> (AGREEMENT) , dated November 17 , 2005 , by and between INDIAN RIVER COUNTY , hereinafter <br /> referred to as the COUNTY, and STANLEY CONSULTANTS , INC . , hereinafter referred to as the <br /> ENGINEER. This amendment addresses changes in Section III — Scope of Services , Section IV — Time for <br /> Completion, and Section V - Compensation " of the AGREEMENT . <br /> Amendment Description <br /> SECTION I - not applicable <br /> SECTION II — not applicable <br /> SECTION III - SCOPE OF SERVICES is being modified to incorporate the following : <br /> The ENGINEER agrees to perform professional roadway design and related services in connection with the <br /> project as required and set. forth in the following : <br /> A . ROADWAY DESIGN (Stanley Consultants , .Inc . ) <br /> Roadway design services will include designing a directional left turn lane at Station 37+00 into <br /> Stoney Point Drive , updating the one roadway plan and profile sheet, four roadway cross section <br /> sheets, one signing and pavement marking sheet, updating drainage calculations due to footprint <br /> changes , quantities , cost estimates and coordination efforts for the following tasks : <br /> 1 . Design horizontal alignment for one directional left turn lane median opening . <br /> 2 . Revise the labeling on one plan sheet to identify the directional median opening . <br /> 3 . Revise seven cross sections to identify the directional median opening . <br /> 4 . Recalculate asphalt, base, earthwork, and curb and gutter quantities . Update cost estimate <br /> accordingly. <br /> 5 . Reanalyze contributing drainage areas in vicinity of directional median opening for two curb <br /> inlets . Update drainage design and documentation accordingly. <br /> B . SIGNING AND PAVEMENT MARKING PLANS ( Stanley Consultants , Inc . ) <br /> Signing and pavement marking plans will include the following tasks : <br /> 1 . Redesign pavement markings to incorporate the directional left turn lane median opening. <br /> 2 . Revise the labeling on one plan sheet to identify new pavement markings and signage for <br /> directional median opening at Station 37+00 . <br /> 3 . Revise signing and pavement marking quantities and cost estimate accordingly. <br /> CR 510 Amendment 6 Pagel of 3 10/8 /2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.