Laserfiche WebLink
The physical location of any equipment located at an alternate site should be confirmed with a representative from that location and the <br /> address should be documented in the grantee folder before the site visit. <br /> On-Site Monitoring Visit <br /> Once FDEM personnel have arrived at the site, an orientation conference will be conducted. During this time, the purpose of the site <br /> visit and the items FDEM intends to examine will be identified. if financial monitoring visit will be conducted, they will then explain <br /> their objectives and will proceed to perform the financial review. <br /> FDEM personnel will review all files and supporting documentation . Once the supporting documentation has been reviewed, a <br /> tour/visual/spot inspection of equipment will be conducted. <br /> Each item should be visually inspected whenever possible. Bigger items (computers, response vehicles, etc. ) should have an asset decal <br />' <br /> (information/serial number) placed in a prominent location on each piece of equipment as per recipient agency requirements . The serial <br /> number should correspond with the appropriate receipt to confirm purchase. Photographs should betaken of the equipment (large capitol <br /> expenditures in excess of $ 1 ,000. per item), <br /> If an item is not available (being used during time of the site visit), the appropriate documentation must be provided to account for that <br /> particular piece of equipment. Once the tour/visual/spot inspection of equipment has been completed, the FDEM personnel will then <br /> conduct an exit conference with the grantee to review the findings . <br /> Other programmatic issues can be discussed at this time, such as missing quarterly reports, payment voucher/reimbursement, equipment, <br /> questions, etc . <br /> Post Monitoring Visit <br /> FDEM personnel will review the on-site monitoring review worksheets and backup documentation as a team and discuss the events of <br /> the on-site monitoring. <br /> Within 30 calendar days of the site visit, a monitoring report will be generated and sent to the grantee explaining any issues and <br /> corrective actions required or recommendations. Should no issues or findings be identified, a monitoring report to that effect will be <br /> generated and sent to the grantee. The grantee will submit a Corrective Action Plan within a timeframe as determined by the FDEM . <br /> Noncompliance on behalf of sub-grantees is resolved by management under the terms of the Sub grant Agreement. <br /> The On-Site Monitoring Worksheets, the monitoring report and all back up documentation will then be included in the grantee's file. <br /> A. Programmatic Point of Contact <br /> Contractual Point of Contact Programmatic Point of Contact <br /> Alonzo Joseph Jana Smith <br /> FDEM FDEM <br /> 2555 Shumard Oak Blvd. 2555 Shumard Oak Blvd. <br /> Tallahassee, FL 32399-2100 Tallahassee, FL 32399-2100 <br /> (850) 488-3133 (850) 922= 1747 <br /> Alonzo. Jose h(a)em . mvflorida .com .lana. Sin ithr2em .m Florida . com <br /> Be Contractual Responsibilities <br /> • The FDEM shall determine eligibility of projects and approve changes in scope of work . <br /> • The FDEM shall administer the financial processes . <br /> 29 <br /> i <br />