My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-022
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 11:35:18 AM
Creation date
10/1/2015 1:33:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/01/2011
Control Number
2011-022
Agenda Item Number
12.J.1
Entity Name
Summit Construction Management, Inc.
Subject
Reuse Storage Tank and Pumping Facility
Change Order No.1
Area
77th St.
Project Number
UCP 3099
Supplemental fields
SmeadsoftID
9207
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL N0 , 9951 - 1 <br /> SEPTEMBER 22 , 2010 <br /> Model 8901 ball valves , one ( 1 ) Griswold Model 3528FA flow control valve <br /> and one ( 1 ) ASCO Model 8210GO03 solenoid valve ; <br /> • Two ( 2 ) 211 gallon Wessels Model FXA- 800L hydro "pneumatic tanks rated <br /> 125 psi ; <br /> • UL listed , 480 volt , 3 wire , 3 phase distribution panel which includes <br /> the following : <br /> o One ( 1 ) 800 amp main breaker , <br /> o Two ( 2 ) 225 amp pump motor breakers , <br /> o One ( 1 ) 200 amp generator breaker , <br /> o Three ( 3 ) 125 amp pump motor breakers , <br /> o One ( 1 ) 70 amp pump motor breaker , <br /> o Two ( 2 ) 30 amp HVAC breakers , <br /> o One ( 1 ) 15 amp phase monitor breaker , <br /> o One ( 1 ) 30 amp surge arrester breaker , <br /> o One ( 1 ) 30 amp primary transformer breaker ; <br /> • One ( 1 ) control panel which include a phase monitor , surge arrester and <br /> auxiliary breakers ; <br /> • Three ( 3 ) 60 HP VFDs without bypass contactors ; <br /> • One ( 1 ) 25 HP Square " D " across - the - line starter ; <br /> • One ( 1 ) Allen Bradley SLC 5 / 05 PLC with Panelview Plus Compact 1000 ; <br /> • Two ( 2 ) Foxboro Model IGP10 pressure transmitters ; <br /> • Interface panel ; <br /> • One ( 1 ) 10KVA transformer ; <br /> • One ( 1 ) Cutler Hammer manual transfer switch ; <br /> • One ( 1 ) Crouse Hinds generator receptacle ; <br /> • Four ( 4 ) 15 amp GFCI receptacles , <br /> • Two ( 2 ) 20 amp GFCI receptacles ; <br /> • One ( 1 ) exterior light ; <br /> • Six ( 6 ) fluorescent lamps ; <br /> • One ( 1 ) dehumidifier ; <br /> • Two ( 2 ) 4 - ton HVAC unit ; <br /> • Two ( 2 ) Ashcroft Model 1279XLL pressure gauges ; <br /> • All assembled , tested and painted within a modular building size 41 ' - 0 " <br /> long x 14 ' - 0 " wide x 11 ' - 0 " inside height mounted on an aluminum skid <br /> structure , 140 mph wind load , 30 psf snow load and including : <br /> o Aggregate fiberglass resin exterior finish with UV gelcoat ; <br /> o 2 : 12 pitch metal hip roof with 6 " overhang , <br /> o One .( 1 ) 6 ' steel double door , <br /> o One ( 1 ) 2 , 000 lb chain hoist and trolley . <br /> CLARIFICATION/EXCEPTIONS : <br /> • Allen Bradley SLC 5 / 05 processor has been included to accommodate <br /> future fiber connections as noted on plan sheet . <br /> This proposal does not include preparatory job - site work , off - loading , nor <br /> installation of the station or any external equipment . <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.