My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-030A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-030A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2015 1:44:44 PM
Creation date
10/1/2015 5:09:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
02/12/2013
Control Number
2013-030A
Agenda Item Number
8.F.
Entity Name
Summit Construction of Vero Beach
Subject
Shooting Range safety baffle replacement and repairs
Area
Shooting Range
Bid Number
2013018
Supplemental fields
SmeadsoftID
11754
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2013018 -Shooting Range Safety Baffle Repair and Replacement - Addendum 2 <br /> Technical Specifications <br /> Scope <br /> As a result of 11 plus years of public use, one of the wooden safety baffles at 15 yards on the pistol range is beyond <br /> Irepair and must be replaced . AdditieRally, .r, , ie . .e ., , i, aalre needled. +e tiwvn, of the 15afety baffles ,. n + L. <br />e rofle r + Rge at <br /> 50 a ^ a ' 5 yaFd wear . Without the safety baffles, there is noway to prevent projectiles from exiting the ranges and <br /> entering the State Buffer Preserve and other populated areas to the east of the Shooting Range . <br /> The replacement baffle at the pistol range and .epaiFs +„ h.affle .s + + " o rife . , ., .,e will be constructed using original <br /> details that are included as Attachment A. Work to be completed includes : <br /> General <br /> 1 . Remove and store the existing sports lights . <br /> 2 . Any gravel that is in the baffles may be recovered and reused in the new baffles. <br /> 3 . Properly dispose of lumber, hardware, conduit, wiring, and concrete . <br /> 4 . All lumber is to be grade No . 1 <br /> 5 . All lumber treatment is to be 0. 6 CCA. <br /> I 6 . Steel plates on front of posts are to be haFde ^ ed, ARS50, AR500 Steel . <br /> 7 . Baffles are to be completely filled with pea gravel . <br /> Be Reinstall the sports lights with new conduits and wiring . <br /> 9 . Test reinstalled lights to ensure that they work properly. <br /> I 10 . "Top off' the new and FepaiFed-baffles on the pistol range and •ifle FaAgAf with gravel and install new cap <br /> boards and cap flashing. <br /> 11 . At the completion of work, restore to original condition all construction areas and make presentable for <br /> public use . <br /> 12 . If possible, construction days should be completed on consecutive Tuesdays and Wednesdays, during the <br /> . time the range is closed to the public . If not, this project is to be completed in 7 working days. <br /> 13 . Contractor is responsible to obtain Indian River County Building Division permit and is responsible for cost. <br /> Pistol Range <br /> 1 . The pistol range baffle is approximately 180 feet long . <br /> 2 . Dismantle and remove the damaged baffles and posts at 15 yards on the pistol range . <br /> 3 . Construct new baffles on the pistol range at 15 yards, as per the attached plans. <br /> Rifle RaRge <br /> 1 . The rifle baffles aFe motel. . 249 feet lens <br /> 21 . Dis .m.antle the baffles, as needed, at 50yaFGls and :75yaFdS en the Fifle . <br /> MANDAT RY pre-tid meeting wiU he he.ld._at_the_Shoating_Range,_located_at10455102nd -Temce,Sebastian, FL._------ --. <br /> at 9*w A. M., Tuesday, December 18, 2012. Prospective bidders must be signed in by 9:00 a. m. to be credited for <br /> attendance . <br /> Additional information regarding the site, location and operation may be found at www.goshootingirc.com <br /> End of Technical Specifications <br /> Page 8 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.