My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-319
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:40:54 AM
Creation date
10/1/2015 2:37:04 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sustainable gr. & Design, <br />Consuking Civil Engineers <br />APPENDIX D <br />TO <br />AGREEMENT FOR ENGINEERING SERVICES <br />"SCOPE OF SERVICES" <br />SUSTAINABLE ENGINEERING & DESIGN, LLC. <br />EGRET MARSH <br />INDIAN RIVER COUNTY <br />SED -10-062 <br />0 a In <br />frl�yrl = rrnr;� QTY <br />SED -10-062 <br />The PROJECT shall generally be defined and described as providing Civil Engineering & Surveying <br />services for the final completion of the Egret Marsh Stormwater Management Project. Sustainable <br />Engineering & Design, LLC (SED) will subcontract to R. Wayne Richmond, PSM to complete the <br />necessary survey work effort that will assist the County in closing out the project as substantially <br />complete. <br />CONSTRUCTION SERVICES: <br />30-11 Sketch & Description. ENGINEER will subcontract to R. Wayne Richmond, PSM to <br />provide a sketch & description for the 24" stormwater force main from the pump station to the <br />head works pursuant to the approved plans. <br />60-19 Aerial Photographic Survey. ENGINEER will subcontract to R. Wayne Richmond, PSM to <br />obtain the Aerial Photographic Survey background data as necessary from the Aerial <br />Photographic consultant that was previously coordinated with the County as part of the original <br />field work effort. <br />60-21 Survey Field Work. ENGINEER will subcontract to R. Wayne Richmond, PSM to provide <br />additional field work to obtain field data to verify the work effort performed pursuant to the <br />approved design plans and in accordance with Section 01720. <br />60-43 Record Drawing Survey. ENGINEER will subcontract to R. Wayne Richmond, PSM to <br />provide record drawing survey to verify the work effort performed pursuant to the approved <br />design plans and in accordance with Section 01720. Record Drawing Survey is intended to be <br />used by the County to justify that the project has been constructed in substantial conformance. <br />The above proposal and Scope of Services are hereby qualified by the following: <br />1. Other services (engineering, surveying, testing, etc...), not specifically referenced above, are <br />not included herein. <br />P.O. Box 2247 <br />Vero Beach, FL 32961-2247 <br />Office: 772-257-3032 / Fax: 772-257-3033 <br />o u D aQ�jo� <br />D o @gM ° • ° - CP <br />
The URL can be used to link to this page
Your browser does not support the video tag.