Laserfiche WebLink
3 . CONTRACTOR shall provide a qualified , certified operator in accordance with FDEP Permit No . <br /> FLA010434 for operation of the Biosolids Dewatering Facility . At a minimum , the operator shall <br /> be Class B or higher operator and be onsite 1 hour/day for 3 days/week . The operator ' s <br /> qualifications shall be submitted to Indian River County for approval . In addition, other personnel <br /> that are trained in the treatment process and equipment being used, working under the direction of <br /> a certified operator, shall be present at the Dewatering Facility during loading and unloading <br /> operations and during other operating hours . A certified operator shall be on call during periods <br /> the plant is unattended . <br /> 4 . Submitted proposals shall include the number of daily and monthly man- hours of operator <br /> coverage anticipated to be provided by the Proposer . This information shall be labeled as <br /> "ATTACHMENT 1 " and attached to the Bid Form . <br /> 5 . Monitoring results shall be reported at the intervals specified in FDEP Permit No . FLA010434 and <br /> shall be reported on a Discharge Monitoring Report (DMR) , DEP Form 62 - 620 . 910 ( 10) . The <br /> CONTRACTOR shall submit a copy of the DMR to Indian River County , for Indian River <br /> County ' s review of compliance with FDEP Permit No . FLA010434 and other regulatory <br /> requirements . DMRs shall include at a minimum the following : <br /> ® Flow, liquid sidestream to the Indian River County West Wastewater Treatment Facility <br /> • Biochemical oxygen demand <br /> • Total suspended solids <br /> • pH <br /> • Bulk weight of dewatered product <br /> ® Percent solids of dewatered product <br /> e Dry weight of dewatered product <br /> o Total grit removed from septage <br /> 6 . Submittal and approval of the DMR from a compliance perspective with all applicable regulatory <br /> requirements shall be a condition for payment of the CONTRACTOR ' s unit treatment cost for the <br /> particular month covered by the DMR . <br /> 7 . Payment of the CONTRACTOR ' s unit treatment cost for the particular month will only be <br /> approved if the DMR shows that the CONTRACTOR ' s is operating the Dewatering Facility in <br /> compliance with the permit conditions listed in FDEP Permit No . FLA010434 . <br /> 8 . CONTRACTOR shall collect and analyze all parameters which must be monitored in accordance <br /> with Chapter 62 - 601 , F . A . C . CONTRACTOR has maintain properly executed load manifests and <br /> daily scale weight ledgers on- site and be readily available for FDEP inspection . The reports shall <br /> address the total quantity of domestic residuals , septage , and grease processed and trucked away <br /> each day . <br /> 9 . Field activities including on- site tests and sample collection , whether performed by a laboratory or <br /> a certified operator, must follow the applicable procedures described in DEP - SOP - 001 /01 (January <br /> 2002 ) . Alternate field procedures and laboratory methods may be used where they have been <br /> approved according to the requirements of Rules 62 - 160 . 220 , and 62 - 160 . 330 , F . A . C . <br /> Page 16 of 47 <br />