My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-212B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-212B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 2:16:39 PM
Creation date
10/1/2015 5:44:01 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEC: NEC Corporation of America <br /> will not change between the date of Client' s execution of this SOW and Project <br /> Completion . <br /> 7 . 5 Unless otherwise agreed to by NEC in writing , NEC does not guarantee the assignment <br /> of any specific personnel for this Project . NEC requires a minimum Project schedule <br /> extension of 30 days for any personnel change requests made by Client . <br /> 7 . 6 NEC will be relieved of a milestone commitment if Client' s tasks or milestone dates for <br /> that milestone are not met . <br /> 7 . 7 If the scope of the . Project expands beyond the Deliverables defined in this SOW , Client <br /> may be required to pay NEC additional fees and expenses incurred by NEC . <br /> The following are not covered under this SOW : <br /> 7 . 8 Support or replacement of any Equipment due to (a ) Client' s unauthorized maintenance <br /> or repair of the Equipment , ( b ) Client's unauthorized add , move , or changes to the <br /> Equipment , (c) unusual physical , electrical or electromagnetic stress ( d ) Client <br /> negligence or abuse of the Equipment , including connection to inappropriate power <br /> supplies , ( e ) fire , flood , wind , lightning , or other similar acts of God , (f) failure of Client <br /> to <br /> maintain proper environmental conditions for the Equipment ( g ) improper wiring , <br /> installation , repair , or alteration of the software or hardware by anyone other than NEC or <br /> its agents , ( h ) software changes or attempted changes in the Equipment by persons not <br /> authorized by NEC ( i ) database reprogramming required because of Client error of any <br /> kind Q ) failure of rotation media not furnished by NEC ( k ) operation of the Equipment with <br /> other third party products not in accordance with the Equipment manufacturer's <br /> specifications ( 1 ) failures or other problems caused by products for which NEC is not <br /> otherwise contractually responsible or ( n ) Equipment failures due to causes other than <br /> ordinary use . <br /> 7 . 9 Any hardware upgrades , not specifically included in this SOW , but required to run new or <br /> updated Software . <br /> 8 . CHANGE MANAGEMENT PROCEDURES <br /> INDIAN RIVER COUNTY ( 2013 - 28122 ) 10 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.