My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUPPLEMENTARY CONDITIONS <br /> • <br /> PART I - AMENDMENTS TO GENERAL CONDITIONS <br /> These Supplementary Conditions amend or supplement the Standard General Conditions of the Construction <br /> Contract (EJCDC Document No . C-700 , 2002 edition) and other provisions of the Contract Documents as <br /> I <br /> ndicated below . All provisions which are not so amended or supplemented remain in full force and effect. <br /> ARTICLE 2 - PRELIMINARY MATTERS <br /> SC-2 . 01 . Delete paragraphs 2 . 01A and B of the General Conditions in its entirety . <br /> SC 2 . 03A . Delete paragraph 2 . 03A of the General Conditions in its entirety , and replace with the following : <br /> The Contract Times will commence to run on the day indicated in the Notice to Proceed . A Notice to <br /> Proceed may be given at any time within 60 days after the Effective Date of the Agreement . <br /> SC 2 . 05AL Add the following immediately at the end of subparagraph 2 . 05A1 : using the Critical Path <br /> Method (CPM) . <br /> SC 2 . 05A . 4 . Add new subparagraph 4 after the existing text of 2 . 05 of the General Conditions : <br /> 4 . If this Project is an addition to an existing working plant, then the Contractor shall coordinate with the <br /> Owner on tie-ins . The Owner shall have final say on plant shut down times and duration to make tie -ins_ <br /> ARTICLE 3 - CONTRACT DOCUMENTS : INTENT , AMENDING , REUSE <br /> SC- 3 . 01C . Add new paragraph D immediately after Paragraph 3 . 01C of the General Conditions to read as <br /> follows : <br /> D . Each and every provision of law and clause required by law to be inserted in these Contract Documents <br /> shall be deemed to be inserted herein , and they shall be read and enforced as though it were included herein <br /> SC3 . 03A . 3 Delete existing 3 . 03A . 3 of the General Conditions in its entirety and replace it with the <br /> following : <br /> Contractor shall not be liable to Owner or Engineer for failure to report any such conflict, error, ambiguity , <br /> or discrepancy in the Contract Documents unless Contractor knew or, in the exercise of ordinary care, <br /> reasonably should have recognized such conflict, error, ambiguity , or discrepancy and failed to report it in <br /> writing to the Owner and the Engineer . <br /> SC 3 . 03B Delete existing 3 . 03B of the General Conditions in its entirety and replace it with the following <br /> B . Resolving Discrepancies. Except as may be otherwise specifically stated in the Contract Documents , the <br /> provisions of the Contract Documents shall be read together as a whole not in isolation so as to give meaning to <br /> each provision ; however, to the extent there is a conflict or inconsistency between or among provisions , the <br /> strictest or most stringent standard shall apply . <br /> ARTICLE 4 - AVAILABILITY OF LANDS ; SUBSURFACE AND PHYSICAL CONDITIONS ; <br /> HAZARDOUS ENVIRONMENTAL CONDITIONS ; REFERENCE POINT` S <br /> 00800 - 3 <br /> Ir <br /> r .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.