Laserfiche WebLink
D . Scheduling : Unless it prejudices Work already excavated and uncovered, Contractor shall schedule layout, <br /> excavating and uncovering of Work or Underground Facilities a sufficient time in advance to allow <br /> the <br /> Engineer ' s review, and the possible amending or supplementing of the Contract Documents . <br /> E . UTILITY COORDINATION . <br /> 1 . CONTRACTOR ' S Responsibility : The CONTRACTOR shall be responsible for making all necessary <br /> arrangements with governmental departments, public utilities, public carriers , service companies and corporations <br /> owning or controlling roadways , railways , water, sewer, gas , electrical , cable television , telephone, and telegraph <br /> facilities such as pavements , tracks , piping, wires , cables, conduits , poles, guys , etc . , including <br /> incidental <br /> structures connected therewith , that are encountered in the Work in order that such items may be properly shored, <br /> supported and protected, or the Contractor shall be solely responsible for coordinating their relocation . The <br /> . Contractor shall give proper notices , shall comply with requirements of such parties in the performance of its <br /> Work, shall permit entrance of such parties on the Work, and shall pay all charges and fees made by such parties <br /> for its Work . The Contractor ' s attention is called to the fact that there may be delays on the Project due to Work <br /> to be done by governmental departments , public utilities, and others in repairing poles , conduits , etc . The <br /> Contractor shall cooperate with the above parties, in every way possible, so that the construction <br /> can be <br /> completed in the least possible time . <br /> 2 . Connection : At all points where the Work constructed by the Contractor connects to existing utilities and <br /> services, the actual Work of making the necessary connection to the existing service or utility shall be arranged <br /> for by Contractor at no additional expense to Owner (unless specifically indicated otherwise) . Services and <br /> utilities included within (but not limited to) this responsibility are roads , ditches , electrical , sewer, mechanical , <br /> utilities, water, fencing , etc . Connections shall be made at a time that will result in the least possible interference <br /> with existing services . <br /> Sc 4 . 03A Delete 4 . 03 A of the General Conditions in its entirety and replace it with the following : <br /> A . Notice. The Contractor shall promptly , and before such conditions are disturbed, and in no event later than 10 <br /> days after first observance of the conditions . Notify the Owner and Engineer in writing of: ( 1 ) subsurface or <br /> latent physical conditions at the site differing materially from those indicated in this Contract, or (2 ) unknown <br /> physical conditions at the site of an unusual nature , differing materially from those ordinarily encountered and <br /> generally recognized as inherent in Work of the character provided for in this Contract. The Owner will promptly <br /> investigate the conditions, and if it finds that such conditions do materially so differ and cause an increase or <br /> decrease in the Contractor ' s cost of, or the time required for, performance of any part of the Work under this <br /> Contract, a Change Order shall be issued accordingly based on the Schedule of Values and executed by the <br /> Owner and the Contractor . Contractor ' s failure to provide notice upon discovery of the differing site condition <br /> shall waive any entitlement to such an adjustment in the Contract Price or Contract Time . Further, no Claim of <br /> the Contractor under this paragraph 4 . 03A shall be allowed unless the Contractor has given the notice as required <br /> M <br /> n this paragraph 4 . 03A . <br /> SC 4 . 03B . Delete paragraph 4 . 0313 of the General Conditions in its entirety . <br /> SC 4 . 03C1 Delete subparagraph 4 . 03C 1 of the General Conditions in its entirety . <br /> SC 4 . 03C . 1 . Delete subparagraphs 4 . 03C 1 a . and b . of the General Conditions in its entirety . <br /> SC 4 . 03C3 . Delete paragraph 4 . 03C3 . of the General Conditions in its entirety . <br /> SC -4 . 05A . Add the following new paragraph immediately after paragraph 4 . 05A . of the General Conditions to <br /> . read as follows : <br /> B . The Contractor shall furnish all stakes , templates and other materials necessary for establishing <br /> and <br /> maintaining the lines and grades necessary for control and construction of the Work . Engineer may check the <br /> 00800- 5 <br /> 11 Y11 L <br /> .,.. <br />