Laserfiche WebLink
IF <br /> IF IF IF , <br /> FIF <br /> IF le <br /> IF FJ, <br /> Fk <br /> rF ate yx . ,'^ ✓.r.:�"be k Y % r'?; a ':x '-' ".5..FF% , w r <br /> nI Fe <br /> .. YIF 1IF, 1 4F IF' I . <br /> Ic <br /> WORK CHANGE DIRECTIVE <br /> INSTRUCTIONS <br /> 1 . GENERAL INFORMATION <br /> This document was developed for use in situations involving changes in the Work which , if not processed <br /> expeditiously, might delay the Project. These changes are often initiated in the field and may affect the <br /> Contract Price or the Contract Times . This is not a Change Order, but only a directive to proceed with <br /> Work that may be included in a subsequent Change Order. <br /> For supplemental instructions and minor changes not involving a change in the Contract Price or the <br /> Contract Times a Field Order should be used. <br /> 2 . COMPLETING THE WORK CHANGE DIRECTIVE FORM <br /> Engineer initiates the form, including a description of the items involved and attachments . <br /> Based on conversations between Engineer and Contractor, Engineer completes the following : <br /> METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT PRICE : Mark the method <br /> to be used in determining the final cost of Work involved and the estimated net effect on the <br /> Contract Price . If change involves an increase in the Contract Price and the estimated amount is <br /> approached before the additional or changed Work is completed, another Work Change Directive <br /> must be issued to change the estimated price or Contractor may stop the changed Work when the <br /> estimates time is reached . If Work Change Directive is not likely to change the Contract Price, the <br /> space for estimated increase (decrease) should be marked "Not Applicable" . <br /> Once Engineer has completed and signed the form , all copies should be sent to Owner for authorization <br /> because Engineer alone does not have authority to authorize changes in Price or Times . Once authorized <br /> by Owner, a copy should be sent by Engineer to Contractor. Price and Times may only be changed by <br /> Change Order signed by Owner and Contractor with Engineer ' s recommendation . <br /> Paragraph 10 . 03 . A . 2 of the General Conditions requires that a Change Order be initiated and processed to <br /> cover any undisputed sum or amount of time for Work actually performed pursuant to this Work Change <br /> Directive . <br /> Once the Work covered by this directive is completed or final cost and times are determined, Contractor <br /> should submit documentation for inclusion in a Change Order. <br /> THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT <br /> PRICE OR CONTRACT TIMES . A CHANGE ORDER , IF ANY , SHOULD BE CONSIDERED <br /> PROMPTLY . <br /> 00800-24 <br />