My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
di <br /> In <br /> �,a ..� .&,'v x ,a v x t dIn- 14 IV <br /> in dl <br /> SECTION 01311 <br /> CONSTRUCTION SCHEDULES <br /> PART 1 — GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> A . Promptly after award of the Contract, Contractor shall prepare and submit to the Owner <br /> and Engineer estimated construction progress for the Work , with sub - schedules of related <br /> activities which are essential to its progress . <br /> Be Coordinate the work and scheduling with and around other Contractors and individual <br /> trades performing work on the Project . <br /> co Submit revised progress schedules with each application for payment. <br /> D . Progress Schedule shall become part of Contract Documents after approval by Owner. <br /> 1 . 02 RELATED REQUIREMENTS <br /> A . In other parts of the Contract Documents : <br /> 1 . General Conditions : <br /> a . Articles 2 and 6 — Schedules , Reports, and Records <br /> b . Sections 6 . 01 and 6 . 02 — Supervision by Contractor <br /> C * Article 15 — Supervision of Work, Termination , and Delay <br /> Be Specified in other sections : <br /> ui� 1 . Summary of Work is included in Section 01010 . <br /> 2 . Submittals is included in Section 01340 . <br /> 1 . 03 FORM OF SCHEDULES <br /> A . Prepare schedules in the form of a horizontal bar chart as follows : <br /> 1 . Provide separate horizontal bar for each trade or operation <br /> 2 . Horizontal time scale : Identify the first work day of each week. <br /> 3 . Scale and spacing : To allow space for notations and future revisions . <br /> 4 . Minimum sheet size : 24 inch by 36 inch <br /> Be Format of listings : The chronological order of the start of each item of work . <br /> Co Identification of listings : By major specification section numbers . <br /> 1 . 04 CONTENT OF SCHEDULES <br /> A . Construction Progress Schedule shall : <br /> 1 . Show the complete sequence of construction by activity . <br /> 2 . Show the dates for the beginning and completion of each major element of <br /> construction . <br /> 3 . Show projected percentage of completion for each item , as of the first day of <br /> each month . <br /> 01311 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.