Laserfiche WebLink
If <br /> if in <br /> if I <br /> S."_ '.1gr�a's " s 'rA'* 4S;k,„f ' 1" `#ea` �S'w,a't,� r'< . ,� nfi .� r+sv` _ t v <br /> a , x., t o, In 11 z _ e y tIf <br /> w �a <br /> 41 <br /> 1411 1% Ill, IV fir <br /> If I <br /> on the cover sheet. The cover sheet shall fully describe the packaged data and include a <br /> listing of all items within the package . Provide to the Resident Project Representative a <br /> copy of each transmittal sheet for shop drawings, product data and samples at the time of <br /> submittal to the Engineer . <br /> C . The Contractor shall utilize the following Shop Drawing numbering system : <br /> ] . The Submittal Lou Number shall reference the Specification Section Number , <br /> 2 . The numbering system shall be specification section number followed by a " I " <br /> for original submittal , " 1 A " for first resubmittal and so forth , ( for example : <br /> 15050 -1 15050 - 1A ., 15050 - 113001 ) <br /> D . Notify the Engineer in writing, at the time of submittal , of any deviations in the <br /> submittals from the requirements of the Contract Documents . <br /> E . The review and approval of shop drawings , samples or product data by the Engineer shall <br /> not relieve the Contractor from the responsibility for the fulfillment of the terms of the <br /> Contract. All risks of error and omission are assumed by the Contractor and the Engineer <br /> will have no responsibility therefor. <br /> F . No portion of the work requiring a shop drawing , sample, or product data shall be started <br /> nor shall any materials be fabricated or installed prior to the approval or qualified <br /> approval of such item . Fabrication performed, materials purchased or on - site construction <br /> accomplished which does not conform to approved shop drawings and data shall be at the <br /> Contractor' s risk . The Owner will not be liable for any expense or delay due to <br /> corrections or remedies required to accomplish conformity . <br /> G . Project work, materials, fabrication, and installation shall conform with approved shop <br /> drawings, applicable samples , and product data . <br /> 1 . 04 SUBMISSION REQUIREMENTS <br /> A . Make submittals promptly in accordance with approved schedule and in such sequence as <br /> to cause no delay in the Work or in the work of any other contractor. <br /> Be Each submittal , appropriately coded, will be returned within 30 calendar days following <br /> receipt of submittal by the Engineer . <br /> C . Number of submittals required : <br /> 1 . Shop Drawings : Submit the number of opaque reproductions which the <br /> contractor requires , plus five ( 5 ) copies which will be retained by the Engineer . <br /> 2 . Product Data : Submit the number ofcopies which the Contractor requires , plus five <br /> ( 5 ) copies which will be retained by the Engineer . <br /> 3 . Samples : Submit the number stated in the respective Sections . <br /> D . Submittals shall contain : <br /> 1 . The date of submission and the dates of any previous submissions . <br /> 2 . The Project title and number. <br /> 3 . Contractor identification . <br /> 4 . The names of: <br /> a . Contractor <br /> 01340- 3 <br /> if <br /> in , 777777 1 "fee r'7iI <br /> I If <br /> In - ir in 1144 1 ill <br /> if nf <br /> E� �' t ,x. c _ if <br />