My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV I <br /> Vie V <br /> IVeAy <br /> le I <br /> ' e ,xVA OV VI " .�4,1 Wr% sSs ,$�VerIVV V, iqi Vie I id <br /> , 'An r �" V. <br /> llIli IV VVVVV'e <br /> V Vie le <br /> SECTION 0 15 10 <br /> TEMPORARY UTILITIES <br /> PART 1 - GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> A . Furnish , install , and maintain temporary utilities required for construction ; remove on <br /> completion of entire project . <br /> Be Provide temperature, ventilation , and lighting requirements , if applicable, as specified in <br /> each individual section . <br /> 1 . 02 RELATED REQUIREMENTS <br /> A . Summary of Work is included in Section 01010 . <br /> 1 . 03 REQUIREMENTS OF REGULATORY AGENCIES <br /> A . Comply with National Electric Code , <br /> Be Comply with federal , state, and local codes and regulations , and with utility company <br /> • requirements . <br /> PART 2 - PRODUCTS <br /> 2001 MATERIALS (GENERAL) <br /> Materials may be new or used, but must be adequate in capacity for the required usage . They <br /> MUST NOT create unsafe conditions, and MUST NOT violate requirements of applicable codes <br /> and standards . <br /> 2 <br /> 2 . 02 TEMPORARY ELECTRICITY AND LIGHTING <br /> A . The Contractor must maintain power to all existing buildings and areas . <br /> Be The Contractor is responsible for providing and paying for all power required for his <br /> operations . Contractor shall make arrangements with Owner for temporary power. <br /> C . Contractor is responsible for arranging power for his office trailers (s) , power tools, etc . , <br /> at his own expense . The Contractor shall pay the costs of all power used . <br /> D . Provide POWER CENTERS for miscellaneous tools and equipment used in the work : <br /> 1 . Weatherproof distribution box with minimum of four 20 - amp . , 120- volt <br /> grounded outlets . <br /> 2 . Locate so thatower is available at any y point of use with minimum 100 -foot � <br /> CONSTRUCTION -TYPE power cords . <br /> 3 . Provide circuit breaker protection for each outlet. <br /> 01510- 1 IV <br />
The URL can be used to link to this page
Your browser does not support the video tag.