My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01700 <br /> CONTRACT CLOSEOUT <br /> PART I — GENERAL <br /> 1 . 01 SCOPE OF WORK <br /> A . This Section specifies administrative and procedural requirements for project closeout, <br /> including but not limited to : <br /> 1 . Closeout procedures . <br /> 2 . Final cleaning . <br /> 3 . Adjusting , <br /> 4 . Project Record documents . <br /> 5 . Spare parts and maintenance materials . <br /> 1 . 02 RELATED WORK <br /> A . Operation and Maintenance Data are included in Section 01730 . <br /> Be Warranties and Bonds are included in Section 01740 . <br /> 1903 RECORD DOCUMENTS <br /> A . Maintain on site <br /> one set of the following documents ; actual revisions to the work shall <br /> be recorded in these documents : <br /> 1 . Contract Drawings . <br /> 2 . Specifications . <br /> 3 . Addenda . <br /> 4 . Change Orders and other Modifications to the Contract. <br /> 5 . Reviewed shop drawings , product data, and samples . <br /> Be Store Record Documents separate from documents used for construction . <br /> C . Record information concurrent with construction progress . <br /> D . Specifications : Legibly mark and record at each product section description of actual <br /> products installed, including the following : <br /> 1 . Manufacturer's name and product model and number. <br /> 2 . Product substitutions or alternates utilized . <br /> 3 . Changes made by Addenda and Modifications , <br /> f <br /> f <br /> E . Contract Drawings and Shop Drawings : Legibly mark each item to record actual <br /> construction including : <br /> 1 . Measured depths of foundations in relation to finish floor elevation datum . <br /> 2 . Measured horizontal and vertical locations of underground utilities and <br /> appurtenances , referenced to permanent surface improvements . <br /> 3 . Measured locations of internal utilities and appurtenances concealed in <br /> construction, referenced to visible and accessible features of the work. <br /> 01700- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.