Laserfiche WebLink
SECTION 01720 <br /> PROJECT RECORD DOCUMENTS <br /> PARTI GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> A . Maintain at the site for the Owner one record copy of: <br /> L Drawings <br /> 2 . Specifications <br /> 3 , Addenda <br /> 4 . Change Orders and other Modifications to the Contract <br /> 5 . Engineer ' s Field Orders or written instructions <br /> 6 . Approved Shop Drawings , Working Drawings and Samples <br /> 7 . Field Test records <br /> 8 . Construction photographs <br /> 9 . Field engineering records for compliance with field engineering submittals <br /> 1 . 02 RELATED REQUIREMENTS <br /> A . Section 01050 : Field Engineering <br /> B . Section 01052 : Application for Payment <br /> C . Section 01340 : Submittals <br /> 1 . 03 MAINTENANCE OF DOCUMENTS AND SAMPLES <br /> A . Store documents and samples in Contractor ' s field office apart from documents used for <br /> construction . <br /> 1 . Provide files and racks for storage of documents . <br /> 2 . Provide locked cabinet or secure storage space for storage of samples . <br /> B . File documents and samples in accordance with CSI/CSC format. <br /> C . Maintain documents in a clean , dry , legible condition and in good order. Do not use record <br /> documents for construction purposes . <br /> D . Make documents and samples available at all times for inspection by the Resident Project <br /> Representative , <br /> E . As a prerequisite for monthly progress payments , the Contractor is to exhibit the currently <br /> updated "record documents " for review by the Engineer and Owner. <br /> 1 . 04 MARKING DEVICES <br /> A . Provide felt tip marking pens for recording information in the color code designated by the <br /> Resident Project Representative . <br /> • <br /> 01720 - 1 <br />