My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01720 <br /> PROJECT RECORD DOCUMENTS <br /> PARTI GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> A . Maintain at the site for the Owner one record copy of: <br /> L Drawings <br /> 2 . Specifications <br /> 3 , Addenda <br /> 4 . Change Orders and other Modifications to the Contract <br /> 5 . Engineer ' s Field Orders or written instructions <br /> 6 . Approved Shop Drawings , Working Drawings and Samples <br /> 7 . Field Test records <br /> 8 . Construction photographs <br /> 9 . Field engineering records for compliance with field engineering submittals <br /> 1 . 02 RELATED REQUIREMENTS <br /> A . Section 01050 : Field Engineering <br /> B . Section 01052 : Application for Payment <br /> C . Section 01340 : Submittals <br /> 1 . 03 MAINTENANCE OF DOCUMENTS AND SAMPLES <br /> A . Store documents and samples in Contractor ' s field office apart from documents used for <br /> construction . <br /> 1 . Provide files and racks for storage of documents . <br /> 2 . Provide locked cabinet or secure storage space for storage of samples . <br /> B . File documents and samples in accordance with CSI/CSC format. <br /> C . Maintain documents in a clean , dry , legible condition and in good order. Do not use record <br /> documents for construction purposes . <br /> D . Make documents and samples available at all times for inspection by the Resident Project <br /> Representative , <br /> E . As a prerequisite for monthly progress payments , the Contractor is to exhibit the currently <br /> updated "record documents " for review by the Engineer and Owner. <br /> 1 . 04 MARKING DEVICES <br /> A . Provide felt tip marking pens for recording information in the color code designated by the <br /> Resident Project Representative . <br /> • <br /> 01720 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.