Laserfiche WebLink
pBsif <br /> PRE - BID MEETING <br /> Attendees : See attached spreadsheet <br /> From : Matt O ' Connor <br /> CC : Kim Keefer <br /> Subject : Indian River County North Remote Supply Wells <br /> Date : January 7 , 2010 <br /> The meeting began with an overview of the project . Indian River County has drilled six wells and desires <br /> io iiIStail well piiinpS aiid weir noises along with the raw Water piping . 1' otir of the <br />six new wells Will <br /> require power and control wiring from the North Water Plant . Wells # 7 and #9 will have power <br /> drops <br /> supplied by FPL and will not have power from the water plant . Wells 47 and 89 will still <br /> have control <br /> wiring from the plant. <br /> CLARIFICATIONS : <br /> County is arranging Environmental Survey . <br /> . The Estimate of Probable Cost is about $ 2 million . <br /> Periodic inspections will be performed by PISS &J with day to day inspections by Indian River County . <br />