My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 . Bidder agrees that the work will be completed in accordance with the following <br /> timeframe . <br /> ( a ) Within 60 calendar days from effective date of Notice to Proceed , Contractor shall <br /> complete the following tasks : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to be <br /> utilized in the job . <br /> 3 . Perform all photographic recording and documentation of conditions prior <br /> to construction . <br /> 4 . Locate all existing utilities in the area of work . <br /> 5 . Submit and secure approval of shop drawings <br /> 6 . Mobilize all labor , equipment , and materials . <br /> 7 . Deliver and store all equipment and materials to the job site . <br /> 8 . Notify all utilities and other affected parties prior to initiating construction . <br /> ( b ) From 0 calendar days to 240 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Install all pipe and appurtenant items . <br /> 2 . Perform all testing . <br /> 3 . Restore all disturbed areas to their pre - construction condition . <br /> 4 . Correct all deficiencies noted by Engineer . <br /> Completion of all tasks outlined above ( i . e . , Subparagraphs a ) and b ) constitutes <br /> Substantial Completion . <br /> ( c) From 241 calendar days to 270 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Clean up project area . <br /> 2 . Remove all equipment and material from project site . <br /> 3 . Perform contract closeout procedures . <br /> Completion of all tasks outlined above ( Le . , Subparagraphs a , b , and c ) constitute <br /> Final <br /> Completion . <br /> 6 . The following documents are attached to and made a part of this Bid : <br /> (a ) Certificate of Compliance with the Florida Trench Safety Act ( Section 00300 Bid <br /> Form) . <br /> ( b ) Disclosure of Relationships ( Section 00452) <br /> ( c ) General Information Required for Bidders ( Section 00456) <br /> (d ) Local Preference in Purchasing or Contracting (Section 00200 ) <br /> 7 . The terms used in this Bid , which are defined in the General Conditions of the <br /> Construction Contract included as part of the Contract Documents , have the <br /> meanings assigned to them in the General Conditions . Contractor acknowledges <br /> the insurance requirements of Section 00700 as amended by Section 00800 and <br /> any other addendums and agrees to provide said insurance upon award of <br /> contract . <br /> 00300 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.