Laserfiche WebLink
• SECTION 00530 - EJCDC <br /> AGREEMENT BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> i - <br /> THIS AGREEMENT ( "Agreement" or " Contract") dated «t�' �, t � 12010 <br /> by and between Indian River County , a political subdivision of the Staf.6 of Florida (" OWNER ") and <br /> Timothy Rose Contracting Inc ("CONTRACTOR" ) . <br /> BACKGROUND RECITALS <br /> A . Pursuant to applicable provisions of Florida law , OWNER has selected CONTRACTOR to perform <br /> certain work as more specifically described in the Contract Documents on the terms set forth in <br />the <br /> Contract Documents . <br /> B . CONTRACTOR agrees to perform certain work as more specifically described in the Contract <br /> Documents on the terms set forth in the Contract Documents , <br /> NOW THEREFORE, OWNER and CONTRACTOR , in consideration of the mutual covenants <br /> hereinafter set forth , and intending to be legally bound , agree as follows : <br /> ARTICLE 1 WORK <br /> 1 . 1 . CONTRACTOR as an independent contractor and not as an employee shall furnish and <br /> • complete all of the necessary labor, material , and equipment to perform the work as specified <br /> or <br /> indicated in the Contract Documents . CONTRACTOR shall complete all work as specified or indicated <br /> in the Contract Documents . The work is generally described as follows , and shall include , but is not <br /> necessarily limited to the following : <br /> This project includes the construction of the remote well facilities, to <br /> include well pumps , piping , electrical , controls , and instrumentation . All <br /> ancillary work associated with these systems are to be included . <br /> ARTICLE 2 ENGINEER <br /> 2 . 1 . The project has been designed by PBS &J , hereinafter called ENGINEER , and who is to <br /> act as OWNER'S representative, assume all duties and responsibilities and have the rights and <br /> authority assigned to ENGINEER in the Contract Documents in connection with completion of the <br /> work in accordance with the Contract Documents , <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1 . Contract Times . The CONTRACTOR shall be substantially completed with the following <br /> timeframe <br /> (a ) Within 60 calendar days from effective date of Notice to Proceed , Contractor shall <br /> complete the following tasks : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to be <br /> utilized in the job . <br /> 3 . Perform all photographic recording and documentation of conditions prior to <br /> 00530 - 1 <br />