Laserfiche WebLink
6 . 2 . Acceptance of Final Payment as Release . The acceptance by the CONTRACTOR of <br /> final payment shall be and shall operate as a release to the OWNER from all claims and all liability <br /> to the CONTRACTOR other than claims in stated amounts as may be specifically excepted by the <br /> CONTRACTOR for all things done or furnished in connection with the work under this Contract and <br /> for every act and neglect of the OWNER and others relating to or arising out of the <br />work . Any <br /> payment , however, final or otherwise , shall not release the CONTRACTOR or its sureties from any <br /> obligations under the Contract Documents or the Payment and Performance Bonds . <br /> ARTICLE 7 CONTRACTOR'S REPRESENTATIONS <br /> 7 . 1 . In order to induce OWNER to enter into this Agreement , CONTRACTOR makes the <br /> following representations : <br /> 7. 1 . 1 : CONTRACTOR has familiarized itself with the nature and extent of the Contract <br /> Documents , work , site , locality , and all local conditions and laws and regulations that in any manner <br /> may affect cost, progress , performance or furnishing of the work . <br /> 7 . 1 . 2 . CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br /> conditions and drawings of physical conditions which are identified in the Supplementary Conditions <br /> as provided in Paragraph 4 . 02 of the General Conditions , and accepts the determination set forth in <br /> Paragraph SC4 . 02 of the Supplementary Conditions of the extent of the technical data contained in <br /> such reports and drawings upon which CONTRACTOR is entitled to rely. <br /> 7. 1 . 3 . CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br /> obtaining and carefully studying ) all such examinations , investigations , explorations , tests , reports and <br /> • studies ( in addition to or to supplement those referred to in Paragraph 7 . 2 above) which pertain to the <br /> subsurface or physical conditions at or contiguous to the site or otherwise may affect <br /> the cost , <br /> progress , performance or furnishing of the work as CONTRACTOR considers necessary for the <br /> performance of furnishing of the work at the Contract Price , within the Contract Time and in <br /> accordance with the. other terms and conditions of the Contract Documents , including specifically the <br /> provisions of Paragraph 4 . 02 of the General Conditions ; and no additional examinations , <br /> investigations , explorations , tests , reports , studies or similar information or data are or will be required <br /> by CONTRACTOR for such purposes . <br /> 7 . 1 . 4 . CONTRACTOR has reviewed and checked all information and data shown or indicated <br /> on the Contract Documents with respect to existing underground facilities at or contiguous to the site <br /> and assumes responsibility for the accurate location of said underground facilities . No additional <br /> examinations , investigations , explorations , tests , reports , studies or similar information or data in <br /> respect of said underground facilities are or will be required by CONTRACTOR in order to perform <br /> and furnish the work at the Contract Price , within the Contract Time and in accordance with the other <br /> terms and conditions of the Contract Documents , including specifically the provisions of Paragraph <br /> 4 . 04 of the General Conditions . <br /> 7 . 1 . 5 . CONTRACTOR has correlated the results of all such observations , examinations , <br /> investigations , explorations , tests , reports and studies with the terms and conditions of the Contract <br /> Documents , <br /> 7 . 1 . 6 . CONTRACTOR has given ENGINEER written notice of all conflicts , errors or <br /> discrepancies that he has discovered in the Contract Documents and the written resolution thereof by <br /> ENGINEER is acceptable to CONTRACTOR. <br /> • ARTICLE 8 CONTRACT DOCUMENTS <br /> 00530-4 <br />