<br /> not involve a change in the Contract Price or the Contract duration of the activities comprising the Contractor ' s
<br /> plan
<br /> Times . to accomplish the Work within the Contract Times ,
<br /> 21 . General Requirements-- Sections of Division 1 of 33 . Project- - The total construction of which the
<br /> the Specifications . The General Requirements pertain to Work to be performed under the Contract Documents may
<br /> all sections of the Specifications . be the whole , or a part .
<br /> 22 . Hazardous Environmental Condition--The 34 . Project Manual-- The bound documentary
<br /> presence at the Site of Asbestos , PCBs, Petroleum , information prepared for bidding and constructing the
<br /> Hazardous Waste, or Radioactive Material in such Work . A listing of the contents of the Project Manual ,
<br /> quantities or circumstances that may present a substantial which may be bound in one or more volumes, is
<br /> danger to persons or property exposed thereto in contained in the table(s) of contents ,
<br /> connection with the Work .
<br /> 35 . Radioactive Material-- Source, special nuclear, or
<br /> 23 . Hazardous Waste--The term Hazardous Waste byproduct material as defined by the Atomic Energy Act
<br /> shall have the meaning provided in Section 1004 of the of 1954 (42 USC Section 201 1 et seq .) as
<br /> amended from
<br /> Solid Waste Disposal Act (42 USC Section 6903 ) as time to time ,
<br /> amended from time to time .
<br /> 36 . Related Entity -- An officer, director, partner, did
<br /> 24 . Laws and Regulations; Laws or Regulations-- employee, agent, consultant, or subcontractor.
<br /> Any and all applicable laws, rules , regulations, ordinanc-
<br /> es, codes, and orders of any and all governmental bodies, 37 . Resident Project Representative--The authorized
<br /> agencies, authorities, and courts having jurisdiction . representative of Engineer who may be assigned to the
<br /> Site or any part thereof.
<br /> 25 . Liens--Charges, security interests, or
<br /> encumbrances upon Project funds, real property, or 38 . Samples- - Physical examples of materials,
<br /> personal property , equipment, or workmanship that are representative of
<br /> some portion of the Work and which establish the
<br /> 26 . Milestone- -A principal event specified in the standards by which such portion of the Work
<br />will be
<br /> Contract Documents relating to an intermediate comple- judged .
<br /> tion date or time prior to Substantial Completion of all the
<br /> Work . 39 . Schedule of Submittals--A schedule, prepared
<br /> and maintained by Contractor, of required submittals and
<br /> 27 . Notice of Award--The written notice by Owner the time requirements to support scheduled performance
<br /> to the Successful Bidder stating that upon timely of related construction activities ,
<br /> compliance by the Successful Bidder with the conditions
<br /> precedent listed therein , Owner will sign and deliver the 40 . Schedule of Values-- A schedule, prepared
<br /> and
<br /> Agreement. maintained by Contractor, allocating portions of the
<br /> Contract Price to various portions of the Work and used
<br /> 28 . Notice to Proceed--A written notice given by as the basis for reviewing Contractor ' s Applications
<br /> for
<br /> Owner to Contractor fixing the date on which the Con- Payment.
<br /> tract Times will commence to run and on which
<br /> Contractor shall start to perform the Work under the 41 . Shop Drawings- -All drawings, diagrams ,
<br /> Contract Documents , illustrations , schedules, and other data or information
<br /> which are specifically prepared or assembled by or for
<br /> 29 . Owner--The individual or entity with whom Contractor and submitted by Contractor to illustrate some
<br /> Contractor has entered into the Agreement and for whom portion of the Work.
<br /> the Work is to be performed .
<br /> 42 . Site-- Lands or areas indicated in the Contract
<br /> 30 . PCBs-- Polychlorinated biphenyls . Documents as being furnished by Owner upon which the
<br /> Work is to be performed , including rights-of-way and
<br /> 31 . Petroleum - - Petroleum, including crude oil or any easements for access thereto, and such other lands
<br /> fraction thereof which is liquid at standard conditions of furnished by Owner which are designated for the
<br /> use of
<br /> temperature and pressure (60 degrees Fahrenheit and 14 . 7 Contractor,
<br /> pounds per square inch absolute), such as oil , petroleum ,
<br /> fuel oil , oil sludge, oil refuse, gasoline, kerosene, and oil
<br /> mixed with other non - Hazardous Waste and crude oils .
<br /> 32 . Progress Schedule--A schedule, prepared and
<br /> maintained by Contractor, describing the sequence and
<br /> EJCDC C-700 Standard General Conditions of the Construction Contract.
<br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
<br /> 00700 - 7