tests, or approvals required by the Contract Documents
<br /> except : C . If it is found that the uncovered Work is defective,
<br /> Contractor shall pay all claims, costs, losses, and damages
<br /> 1 . for inspections, tests, or approvals covered b ( Including but not limited to all fees and charges
<br /> of
<br /> Paragraphs lection and 13 . 03 . D below ; y engineers, architects, attorneys, and other professionals
<br /> and all court or arbitration or other dispute resolution
<br /> 2 . that costs incurred in connection with tests or costs) arising out of or relating to such uncovering,
<br /> inspections conducted pursuant to Paragraph 13 . 04 . E exposure, observation , inspection , and testing, and of
<br /> g P satisfactory replacement or reconstruction ( including but
<br /> shall be paid as provided in said Paragraph 13 . 04 . C ; not limited to all costs of repair or replacement of
<br /> work of
<br /> and others); and Owner shall be entitled to an appropriate
<br /> decrease in the Contract Price . If the parties are unable to
<br /> 3 . as otherwise specifically provided in the Con- agree as to the amount thereof, Owner may make a
<br /> Claim
<br /> tract Documents , therefor as provided in Paragraph 10 . 05 ,
<br /> C . If Laws or Regulations of any public bodyhaving n g D . If, the uncovered Work is not found to be defective,
<br /> jurisdiction require any Work (or part thereof) specifically Contractor shall be allowed an increase i
<br /> to be inspected , tested, or approved by an employee or n the Contract
<br /> p Y Price or an extension of the Contract Times, or both,
<br /> other representative of such public body, Contractor shall
<br /> assume full responsibility for arranging and obtainingdirectly attributable to such uncovering, exposure,
<br /> observation , inspection , testing, replacement, and
<br /> such inspections, tests, or approvals, pay all costs in reconstruction . If the parties are unable to agree as
<br />to the
<br /> connection therewith , and furnish Engineer the required amount or extent thereof, Contractor may make a Claim
<br /> certificates of inspection or approval . therefor as provided in Paragraph 10 . 05 ,
<br /> D . Contractor shall be responsible for arranging and 13 . 05 Owner May Stop the Work
<br /> obtaining and shall pay all costs in connection with any
<br /> inspections, tests , or approvals required for Owner ' s and
<br /> A . If the Work is defective, or Contractor fails to supply
<br /> Engineer ' s acceptance of materials or equipment to be sufficient skilled workers or suitable materials or
<br /> incorporated in the Work; or acceptance of materials, mix
<br /> designs, or equipment submitted fora royal prior to equipment, or fails to perform the Work in such a way
<br /> pp p that the completed Work will conform to the Contract
<br /> Contractor' s purchase thereof for incorporation in the Documents, Owner may order Contractor to stop the
<br /> Work . Such inspections, tests, or approvals shall be Work, or any portion thereof, until the cause for such
<br /> performed by organizations acceptable to Owner and order has been eliminated ; however, this right of Owner
<br /> Engineer. to stop the Work shall not give rise to any duty on the part
<br /> E . If any Work (or the work of others) that is to be of Owner to exercise this right for the benefit of
<br /> Contractor, any Subcontractor, any Supplier, any other
<br /> inspected , tested, or approved is covered b Contractor
<br /> y individual or entity , or any surety for, or employee or
<br /> without written concurrence of Engineer, it must, if
<br /> requested by Engineer, be uncovered for observation . agent of any of them .
<br /> F . Uncovering Work as provided in Paragraph 13 . 03 . E 13 . 06 Correction or Removal of Defective Work
<br /> shall be at Contractor ' s expense unless Contractor has
<br /> given Engineer timely notice of Contractor ' s intention to A . Promptly after receipt of notice, Contractor shall
<br /> correct all defective Work , whether or not fabricated ,
<br /> cover the same and Engineer has not acted with installed , or completed , or, if the Work has been rejected
<br /> reasonable promptness in response to such notice. by Engineer, remove it from the Project and replace it
<br /> 13 . 04 Uncovering Work with Work that is not defective. Contractor shall pay all
<br /> claims, costs, losses, and damages (including but not
<br /> A . If any Work is covered contrary to the written re uest limited to all fees and charges of engineers, architects,
<br /> q attorneys , and other professionals and all court or
<br /> of Engineer, it must, if requested by Engineer, be arbitration or other dispute resolution costs) arising out of
<br /> uncovered for Engineer ' s observation and replaced at or relating to such correction or removal ( including but
<br /> Contractor ' s expense . not limited to all costs of repair or replacement of work of
<br /> B . If Engineer considers it necessary or advisable that others) .
<br /> covered Work be observed by Engineer or inspected or B . When correcting defective Work under the terms of
<br /> tested by others , Contractor, at Engineer' s request, shall this Paragraph 13 . 06 or Paragraph 13 . 07 , Contractor shall
<br /> uncover, expose, or otherwise make available for take no action that would void or otherwise impair
<br /> observation , inspection , or testing as Engineer may Owner ' s special warranty and guarantee, if any, on said
<br /> require, that portion of the Work in question , furnishing Work.
<br /> all necessary labor, material , and equipment.
<br /> 13 . 07 Correction Period
<br /> EJCDC C-700 Standard General Conditions of the Construction Contract. - —
<br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
<br /> 00700 - 34
<br />
|