Laserfiche WebLink
tests, or approvals required by the Contract Documents <br /> except : C . If it is found that the uncovered Work is defective, <br /> Contractor shall pay all claims, costs, losses, and damages <br /> 1 . for inspections, tests, or approvals covered b ( Including but not limited to all fees and charges <br /> of <br /> Paragraphs lection and 13 . 03 . D below ; y engineers, architects, attorneys, and other professionals <br /> and all court or arbitration or other dispute resolution <br /> 2 . that costs incurred in connection with tests or costs) arising out of or relating to such uncovering, <br /> inspections conducted pursuant to Paragraph 13 . 04 . E exposure, observation , inspection , and testing, and of <br /> g P satisfactory replacement or reconstruction ( including but <br /> shall be paid as provided in said Paragraph 13 . 04 . C ; not limited to all costs of repair or replacement of <br /> work of <br /> and others); and Owner shall be entitled to an appropriate <br /> decrease in the Contract Price . If the parties are unable to <br /> 3 . as otherwise specifically provided in the Con- agree as to the amount thereof, Owner may make a <br /> Claim <br /> tract Documents , therefor as provided in Paragraph 10 . 05 , <br /> C . If Laws or Regulations of any public bodyhaving n g D . If, the uncovered Work is not found to be defective, <br /> jurisdiction require any Work (or part thereof) specifically Contractor shall be allowed an increase i <br /> to be inspected , tested, or approved by an employee or n the Contract <br /> p Y Price or an extension of the Contract Times, or both, <br /> other representative of such public body, Contractor shall <br /> assume full responsibility for arranging and obtainingdirectly attributable to such uncovering, exposure, <br /> observation , inspection , testing, replacement, and <br /> such inspections, tests, or approvals, pay all costs in reconstruction . If the parties are unable to agree as <br />to the <br /> connection therewith , and furnish Engineer the required amount or extent thereof, Contractor may make a Claim <br /> certificates of inspection or approval . therefor as provided in Paragraph 10 . 05 , <br /> D . Contractor shall be responsible for arranging and 13 . 05 Owner May Stop the Work <br /> obtaining and shall pay all costs in connection with any <br /> inspections, tests , or approvals required for Owner ' s and <br /> A . If the Work is defective, or Contractor fails to supply <br /> Engineer ' s acceptance of materials or equipment to be sufficient skilled workers or suitable materials or <br /> incorporated in the Work; or acceptance of materials, mix <br /> designs, or equipment submitted fora royal prior to equipment, or fails to perform the Work in such a way <br /> pp p that the completed Work will conform to the Contract <br /> Contractor' s purchase thereof for incorporation in the Documents, Owner may order Contractor to stop the <br /> Work . Such inspections, tests, or approvals shall be Work, or any portion thereof, until the cause for such <br /> performed by organizations acceptable to Owner and order has been eliminated ; however, this right of Owner <br /> Engineer. to stop the Work shall not give rise to any duty on the part <br /> E . If any Work (or the work of others) that is to be of Owner to exercise this right for the benefit of <br /> Contractor, any Subcontractor, any Supplier, any other <br /> inspected , tested, or approved is covered b Contractor <br /> y individual or entity , or any surety for, or employee or <br /> without written concurrence of Engineer, it must, if <br /> requested by Engineer, be uncovered for observation . agent of any of them . <br /> F . Uncovering Work as provided in Paragraph 13 . 03 . E 13 . 06 Correction or Removal of Defective Work <br /> shall be at Contractor ' s expense unless Contractor has <br /> given Engineer timely notice of Contractor ' s intention to A . Promptly after receipt of notice, Contractor shall <br /> correct all defective Work , whether or not fabricated , <br /> cover the same and Engineer has not acted with installed , or completed , or, if the Work has been rejected <br /> reasonable promptness in response to such notice. by Engineer, remove it from the Project and replace it <br /> 13 . 04 Uncovering Work with Work that is not defective. Contractor shall pay all <br /> claims, costs, losses, and damages (including but not <br /> A . If any Work is covered contrary to the written re uest limited to all fees and charges of engineers, architects, <br /> q attorneys , and other professionals and all court or <br /> of Engineer, it must, if requested by Engineer, be arbitration or other dispute resolution costs) arising out of <br /> uncovered for Engineer ' s observation and replaced at or relating to such correction or removal ( including but <br /> Contractor ' s expense . not limited to all costs of repair or replacement of work of <br /> B . If Engineer considers it necessary or advisable that others) . <br /> covered Work be observed by Engineer or inspected or B . When correcting defective Work under the terms of <br /> tested by others , Contractor, at Engineer' s request, shall this Paragraph 13 . 06 or Paragraph 13 . 07 , Contractor shall <br /> uncover, expose, or otherwise make available for take no action that would void or otherwise impair <br /> observation , inspection , or testing as Engineer may Owner ' s special warranty and guarantee, if any, on said <br /> require, that portion of the Work in question , furnishing Work. <br /> all necessary labor, material , and equipment. <br /> 13 . 07 Correction Period <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. - — <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700 - 34 <br />