My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-025
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 1:40:33 PM
Creation date
10/1/2015 1:39:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/08/2011
Control Number
2011-025
Agenda Item Number
8.D.
Entity Name
Timothy Rose Contracting
Subject
Indian River Boulevard Sidewalk Improvements
Area
12th Street to 17th Street
Project Number
0745
Bid Number
2011023
Archived Roll/Disk#
112-0006-R
Supplemental fields
SmeadsoftID
9258
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER. ENGINEER's review and <br /> approval will be only to determine if the items 6 . 19 CONTRACTOR 's General Warranty and <br /> covered by the submittals will , after installation Guarantee <br /> or incorporation in the Work , conform to the _ <br /> information given in the Contract Documents A. CONTRACTOR warrants and guarantees to <br /> and be compatible with the design concept of OWNER, ENGINEER, and ENGINEER's Consultants <br /> the completed Project as a functioning whole as that all Work will be in accordance with the Contract <br /> indicated by the Contract Documents . Documents and will not be defective . <br /> CONTRACTOR's warranty and guarantee hereunder <br /> 2 . ENGINEER's review and approval excludes defects or damage caused by: <br /> will not extend to means , methods , techniques , <br /> sequences , or procedures of construction 1 . abuse , modification , or improper <br /> (except where a particular means , method , maintenance or operation by persons other <br /> technique , sequence, or procedure of con- than CONTRACTOR, Subcontractors , <br /> struction is specifically and expressly called for Suppliers , or any other individual or entity for <br /> by the Contract Documents) or to safety whom CONTRACTOR is responsible; or <br /> precautions or programs incident thereto. The <br /> review and approval of a separate item as such 2 . normal wear and tear under normal <br /> will not indicate approval of the assembly in usage. <br /> which the item functions . <br /> B . CONTRACTOR's obligation to perform and <br /> 3 . ENGINEER's review and approval of complete the Work in accordance with the Contract <br /> Shop Drawings or Samples shall not relieve Documents shall be absolute . None of the following <br /> CONTRACTOR from responsibility for any will constitute an acceptance of Work that is not in <br /> variation from the requirements of the Contract accordance with the Contract Documents or .a release <br /> Documents unless CONTRACTOR has in of CONTRACTOR's obligation to perform the Work in <br /> writing called ENGINEER's attention to each accordance with the Contract Documents : <br /> such variation at the time of each submittal as <br /> required by paragraph 6 . 17 . D .3 and ENGI- 1 . observations by ENGINEER; <br /> NEER has given written approval of each such <br /> variation by specific written notation thereof 2 , recommendation by ENGINEER or <br /> incorporated in or accompanying the Shop payment by OWNER of any progress or final <br /> Drawing or Sample approval ; nor will any payment; <br /> approval by ENGINEER relieve CON - <br /> TRACTOR from responsibility for complying 3 . the issuance of a certificate of Sub- <br /> with the requirements of paragraph 6 . 17 . D . 1 , stantial Completion by ENGINEER or any <br /> payment related thereto by OWNER; <br /> F. Resubmittal Procedures <br /> 4 . use or occupancy of the Work or any <br /> 1 . CONTRACTOR shall make correc- part thereof by OWNER; <br /> tions required by ENGINEER and shall return <br /> the required number of corrected copies of 5, any acceptance by OWNER or any <br /> Shop Drawings and submit as required new failure to do so; <br /> Samples for review and approval . CON- <br /> TRACTOR shall direct specific attention in 6 . any review and approval of a Shop <br /> writing to revisions other than the corrections Drawing or Sample submittal or the issuance of <br /> called for by ENGINEER on previous a notice of acceptability by ENGINEER; <br /> submittals . <br /> 7 . any inspection , test, or approval by <br /> 6 . 18 Continuing the Work others ; or <br /> A. CONTRACTOR shall carry on the Work and 8 . any correction of defective Work by <br /> adhere to the progress schedule during all disputes or OWNER. <br /> disagreements with OWNER. No Work shall be <br /> delayed or postponed pending resolution of any 6 .20 Indemnification <br /> disputes or disagreements , except as permitted by <br /> paragraph 15 . 04 or as OWNER and CONTRACTOR A. To the fullest extent permitted by Laws and <br /> may otherwise agree in writing . Regulations , CONTRACTOR shall indemnify and hold <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 25 <br /> FAEngineering\Capital Projects\0745 IR BLVD SIDEWALK 12th Street to 17th Street\0745 Contract Docs & Specs\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.