My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-025
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 1:40:33 PM
Creation date
10/1/2015 1:39:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/08/2011
Control Number
2011-025
Agenda Item Number
8.D.
Entity Name
Timothy Rose Contracting
Subject
Indian River Boulevard Sidewalk Improvements
Area
12th Street to 17th Street
Project Number
0745
Bid Number
2011023
Archived Roll/Disk#
112-0006-R
Supplemental fields
SmeadsoftID
9258
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C . If the proper execution or results of any part of 8 . 03 Furnish Data <br /> CONTRACTOR's Work depends upon work per- <br /> formed by others under this Article 7, CONTRACTOR A. OWNER shall promptly furnish the data <br /> shall inspect such other work and promptly report to required of OWNER under the Contract Documents . <br /> ENGINEER in writing any delays, defects , or deficien- <br /> cies in such other work that render it unavailable or 8 . 04 Pay Promptly When Due <br /> unsuitable for the proper execution and results of <br /> CONTRACTOR's Work . CONTRACTOR's failure to A. OWNER shall make payments to CONTRAC- <br /> so report will constitute an acceptance of such other TOR promptly when they are due as provided <br /> in <br /> work as fit and proper for integration with paragraphs 14 . 02 . 0 and 14 . 07 . C . <br /> CONTRACTOR's Work except for latent defects and <br /> deficiencies in such other work. 8 . 05 Lands and Easements, Reports and Tests <br /> 7 . 02 Coordination A. OWNER's duties in respect of providing lands <br /> and easements and providing engineering surveys to <br /> A. If OWNER intends to contract with others for establish reference points are set forth in paragraphs <br /> the performance of other work on the Project at the 4. 01 and 4 . 05 . Paragraph 4.02 refers to OWNER's <br /> Site , the following will be set forth in Supplementary identifying and making available to CONTRACTOR <br /> Conditions : copies of reports of explorations and tests of <br /> subsurface conditions and drawings of physical <br /> 1 . the individual or entity who will have conditions in or relating to existing surface or <br /> authority and responsibility for coordination of subsurface structures at or contiguous to the Site that <br /> the activities among the various contractors will have been utilized by ENGINEER in preparing the <br /> be identified ; Contract Documents . <br /> 2 . the specific matters to be covered by 8 . 06 Insurance <br /> such authority and responsibility will be <br /> itemized ; and A. OWNER's responsibilities , if any, in respect to <br /> purchasing and maintaining liability and property insur- <br /> 3 . the extent of such authority and ance are set forth in Article 5 . <br /> responsibilities will be provided . <br /> 8 . 07 Change Orders <br /> B . Unless otherwise provided in the <br /> Supplementary Conditions , OWNER shall have sole A. OWNER is obligated to execute Change <br /> authority and responsibility for such coordination . Orders as indicated in paragraph 10 . 03 . <br /> 8 . 08 Inspections, Tests, and Approvals <br /> ARTICLE 8 - OWNER'S RESPONSIBILITIES <br /> A. OWNER's responsibility in respect to certain <br /> inspections , tests , and approvals is set forth in <br /> 8 . 01 Communications to Contractor paragraph 13 . 03 . 6 . <br /> A. Except as otherwise provided in these 8 . 09 Limitations on OWNER's Responsibilities <br /> General Conditions, OWNER shall issue all communi- <br /> cations to CONTRACTOR through ENGINEER. A. The OWNER shall not supervise , direct, or <br /> have control or authority over, nor be responsible for, <br /> 8 . 02 Replacement of ENGINEER CONTRACTOR's means , methods , techniques , se- <br /> quences , or procedures of construction , or the safety <br /> A. In case of termination of the employment of precautions and programs incident thereto , or for any <br /> ENGINEER, OWNER shall appoint an engineer to failure of CONTRACTOR to comply with Laws and <br /> whom CONTRACTOR makes no reasonable Regulations applicable to the performance of the <br /> objection , whose status under the Contract Work . OWNER will not be responsible for <br /> Documents shall be that of the former ENGINEER. CONTRACTOR's failure to perform the Work in <br /> accordance with the Contract Documents . <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 27 <br /> FAEngineering\Capital Projects\0745 IR BLVD SIDEWALK 12th Street to 17th Street\0745 Contract Docs & Specs\D0700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.