My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-025
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 1:40:33 PM
Creation date
10/1/2015 1:39:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/08/2011
Control Number
2011-025
Agenda Item Number
8.D.
Entity Name
Timothy Rose Contracting
Subject
Indian River Boulevard Sidewalk Improvements
Area
12th Street to 17th Street
Project Number
0745
Bid Number
2011023
Archived Roll/Disk#
112-0006-R
Supplemental fields
SmeadsoftID
9258
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bond _ satisfactory to OWNER to secure the <br /> satisfaction and discharge of such Liens ; + + toye r + ()f i+ rr, c + nn nI +ora GIF GeFror+q� <br /> _h e f 0- 1:In, Ral paymeRt . OWNER shall have seven da�Ils <br /> c. there are other. items entitling OWN- <br /> ER to a set-off against the amount <br /> recommended ; or <br /> A . OWNER has actual knowledge of the that -t#e : E)Fk is Ret--substantially-c mp , <br /> occurrence of any of the events enumerated F= NGInlGl= ate will within 44 days f e uhroission of the- <br /> in paragraphs 14 .02 . B . 5 . a through <br /> 14 .02 . B . 5 . c or paragraph 15 . 02 .A. f <br /> 2 . If OWNER refuses to make payment rnnsiders— then Worm substaRtially ^nn, nla+a <br /> of the full amount recommended by F= ' r' ' ^.� ' F R. , ioqiil within <br /> ENGINEER, OWNER must give said 14 days eK^ +�na <br /> _ t : , ., �, . ,i+h c� <br /> r „ioora <br /> CONTRACTOR immediate written notice (with � _ �_ _ �:� � Ir + \ <br /> a copy to ENGINEER) stating the reasons for tpptAfive list f •torr, + be rnn•, nleted Or- rnrron+ed) <br /> suchaction and promptly pay CONTRACTOR <br /> any amount remaining after deduction of the als ENGINEER believes justified ftel: rnnsidpra+inn G <br /> frprn _ Q1AfNIF= R _ At the time Of delive <br /> amount so withheld . OWNER shall . promptly - <br /> pay CONTRACTOR the amount so withheld , or of—tl ,G +o ^+ +i ' or+ifr , F+o of cc+ n+i I rnm nit�]}jpL1 <br /> AG <br /> any adjustment thereto agreed to by OWNER ElsIGIjEE will deliveF to OWN Gp and rnnlrra <br /> and CONTRACTOR, when CONTRACTOR <br /> corrects to OWNER's satisfaction the. reasons <br /> for such action . QQISITR with ' <br /> , <br /> 3 . If it is subsequently determined . that maiRteaanse , h—�—Utilitiesinsuranse—and r:a raRties <br /> AAd <br /> OWNER's refusal of payment was not justified , <br /> the amount wrongfully withheld shall be treated <br /> paragraph -fn ENIGInIFER • n ,r+•nn rinr +n FNGINEFE � s <br /> as an amount due as determined by <br /> 14 . 02 .C . 1 . <br /> }' CAIr` In1 = ER 's gprpsaid rprorArnendatieRwoll- 6G <br /> 14 . 03 CONTRACTOR 's Warranty of Title biRdiRg <br /> paymeRt- <br /> A. . CONTRACTOR warrants and guarantees <br /> that title to all Work, materials , and equipment covered B . OWNER shall have the right e date of <br /> exclude <br /> by any Application for Payment, whether incorporated CONTRACTOR from the Site after the <br /> in the Projector not, will pass to OWNER no later than Substantial Completion , but OWNER shall allow CON- <br /> the time of payment free and clear of all Liens . TRACTOR reasonable access to complete or correct <br /> items on the tentative list. <br /> 14 .04 Substantial Completion <br /> 14 . 05 Partial Utilization <br /> A. When CONTRACTOR considers . the entire <br /> Work ready for its intended use CONTRACTOR shall A. Use by OWNER at OWNER's option of any <br /> notify OWNER and ENGINEER in writing that the substantially completed part of the Work which has <br /> entire Work is substantially complete (except for items specifically been identified in the Contract Documents , <br /> specifically listed by CONTRACTOR as incomplete) or which OWNER, ENGINEER, and CONTRACTOR <br /> and request that ENGINEER issue . a ceMilcate of agree constitutes a separately functior, ! ng and usable <br /> Substantial Completion . Promptly thereafter, part of the Work that can be used by OWNER for its <br /> OWNER, CONTRACTOR, and ENGINEER shall intended purpose without significant interference with <br /> make an inspection of the Work to determine the CONTRACTOR's performance of the remainder of <br /> status of completion . If ENGINEER does not consider the Work, may be accomplished prior to Substantial <br /> the Work substantially complete , ENGINEER will Completion of all the Work subject to the following <br /> notify CONTRACTOR in writing giving the reasons conditions . <br /> If F= NIr` IlSI �P Siders the .nr.k <br /> therefore . n--�.� <br /> 1 . OWNER at any time may request <br /> 1 ' +n ntnrn_ ER } ' n + + eFtifGate of Substantial CONTRACTOR in writing to permit OWNER to <br /> " V R . y use any such part of the Work which OWNER <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 40 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0745-Indian River Blvd Sidewalk Imp. Proj 12th_17th St. (LAP)Vadmim\bid documents\00700 - General Conditions REV <br /> 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.