Laserfiche WebLink
The subject addendum was generated from a question /clarification raised by a plan <br /> holder . <br /> 1 . The proposed pedestrian bridge will not require an FDOT Certified Fabricator. The piles <br /> must be manufactured at an FDOT certified facility but the superstructure will not require <br /> an FDOT Certified Fabricator. The superstructure must be a Premanufactured Aluminum <br /> Brid a as specified in the contract plans . <br /> * * * * * * * * * * * * * This Addendum MUST be returned with your Bid * * * * * * * * * * * * * * . <br /> ADDENDUM NO . 3 is submitted by <br /> Arjuna We a , P.E., Project Engineer <br /> Je VDavis , Purchasing Manager <br /> 'O <br /> se r <br /> Company Name ( 64 L, � <br /> 4 <br /> Name : ( Id Title : 12e <br /> (Type / Printed) <br /> Authorized Signature : - k <br /> - Date : <br /> k70Telephone : 1 — .56 LI r7 © 0 lax : PZZ 54 - `1 ' <br /> Page 2 of 2 <br /> F:I Public WorksIENGINEERING DIF7SIONPROJEC. TS107dS-Indian River Blvd Sidewalk Imp. Prof 12rh 17th St (LAP)lAdmtmlbid <br /> dacumentsIAddendumviAddendunr Na. 3 01-20-11.doe <br />