My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-204A
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 12:07:28 PM
Creation date
10/1/2015 2:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2011
Control Number
2011-204A
Agenda Item Number
12.I.1
Entity Name
Timothy Rose Contracting
Subject
Intersection Improvements Indian River Boulevard
Area
Indian River Boulevard and 17th St.
Project Number
1024
Bid Number
2011048
Supplemental fields
SmeadsoftID
10258
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.08 Receipt and Application of Insurance <br />Proceeds <br />5.09 Acceptance of Bonds and Insurance; Option <br />to Replace <br />.. <br />evil IN <br />mr <br />UP <br />AAW4wAw&ftAM%PffiM SAN Aft M <br />waftEftMENSM <br />a =S06 <br />a <br />IMMUFA <br />IF <br />5.09 Acceptance of Bonds and Insurance; Option <br />to Replace <br />.. <br />evil IN <br />mr <br />I <br />.. <br />Mr4i.,. <br />IMMUFA <br />da am <br />.. <br />IF Ir <br />MAMPAMANLIFEWMINLARAWMEM&MA0 <br />., <br />rMnam <br />..Awl 1LWFzM a <br />. • <br />AN <br />Aft <br />5.09 Acceptance of Bonds and Insurance; Option <br />to Replace <br />.. <br />evil IN <br />mr <br />I <br />.. <br />IMMUFA <br />da am <br />.. <br />di .. -. <br />.• <br />JL .. <br />am <br />IF <br />WOW <br />IN <br />Low <br />151 <br />MORM <br />OWN 011 "11 <br />M <br />5.10 Partial Utilization, Acknowledgment of <br />Property Insurer <br />A. If OWNER finds it necessary to occupy or use <br />a portion or portions of the Work prior to Substantial <br />Completion of all the Work as provided in paragraph <br />14.05, no such use or occupancy shall commence <br />before the insurers providing the property insurance <br />pursuant to paragraph 5.06 have acknowledged notice <br />thereof and in writing effected any changes in cover- <br />age necessitated thereby. The insurers providing the <br />property insurance shall consent by endorsement on <br />the policy or policies, but the property insurance shall <br />not be canceled or permitted to lapse on account of <br />any such partial use or occupancy. <br />ARTICLE 6 -CONTRACTOR'S RESPONSIBILITIES <br />6.01 Supervision and Superintendence <br />A. CONTRACTOR shall supervise, inspect, and <br />direct the Work competently and efficiently, devoting <br />such attention thereto and applying such skills and <br />expertise as may be necessary to perform the Work in <br />accordance with the Contract Documents. CON- <br />TRACTOR shall be solely responsible for the means, <br />methods, techniques, sequences, and procedures of <br />construction, but CONTRACTOR shall not be <br />responsible for the negligence of OWNER or <br />ENGINEER in the design or specification of a specific <br />means, method, technique, sequence, or procedure of <br />construction which is shown or indicated in and <br />expressly required by the Contract Documents. CON- <br />TRACTOR shall be responsible to see that the <br />completed Work complies accurately with the Contract <br />Documents, <br />B. At all times during the progress of the Work, <br />CONTRACTOR shall assign a competent resident <br />superintendent thereto who shall not be replaced <br />out written notice to OWNER and ENGINEER <br />except under extraordinary circumstances. The <br />superintendent will be CONTRACTOR's <br />representative at the Site and shall have authority to <br />act on behalf of CONTRACTOR. All communications <br />given to or received from the superintendent shall be <br />binding on CONTRACTOR. <br />6.02 Labor; Working Hours <br />A. p <br />CONTRACTOR shall rovide competent, <br />suitably qualified personnel to survey, lay out, and <br />construct the Work as required by the Contract Docu- <br />00700 -General Conditions REV 0 <br />4-07.doc <br />00700 - 18 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1024-17thSlreet and IR Blvd IntersectionWdmim\Contract Documents\00700 -General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.