My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-204A
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 12:07:28 PM
Creation date
10/1/2015 2:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2011
Control Number
2011-204A
Agenda Item Number
12.I.1
Entity Name
Timothy Rose Contracting
Subject
Intersection Improvements Indian River Boulevard
Area
Indian River Boulevard and 17th St.
Project Number
1024
Bid Number
2011048
Supplemental fields
SmeadsoftID
10258
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bond satisfactory to OWNER to secure the <br />satisfaction and discharge of such Liens; <br />c. there are other items entitling OWN- <br />ER to a set-off against the amount <br />recommended; or <br />d. OWNER has actual knowledge of the <br />occurrence of any of the events enumerated <br />iI paragraphs 14.02.B.5.a through <br />14.02.B.5.c or paragraph 15.02.A. <br />2. If OWNER refuses to make payment <br />A the full amount recommended by <br />ENGINEER, OWNER must give <br />CONTRACTOR immediate written notice (with <br />a copy to ENGINEER) stating the reasons for <br />such action and promptly pay CONTRACTOR <br />any amount remaining after deduction of the <br />amount so withheld. OWNER shall promptly <br />pay CONTRACTOR the amount so withheld, or <br />any adjustment thereto agreed to by OWNER <br />and CONTRACTOR, when CONTRACTOR <br />corrects to OWNER's satisfaction the reasons <br />for such action. <br />3. If it is subsequently determined that <br />OWNER'0 refusal of payment was not justified, <br />the amount wrongfully withheld shall be treated <br />as an amount due as determined by paragraph <br />14,02,C.10 <br />14.03 CONTRACTOR's Warranty of Title <br />A. CONTRACTOR warrants and guarantees <br />that title to all Work, materials, and equipment covered <br />by any Application for Payment, whether incorporated <br />in the Project or not, will pass to OWNER no later than <br />the time of payment free and clear of all Liens. <br />14.04 Substantial Completion <br />A. When CONTRACTOR considers the entire <br />Work ready for its intended use CONTRACTOR shall <br />notify OWNER and ENGINEER in writing that the <br />entire Work is substantially complete (except for items <br />specifically listed by CONTRACTOR as incomplete) <br />and request that ENGINEER issue a certificate of <br />Substantial Completion. Promptly thereafter, <br />OWNER, CONTRACTOR, and ENGINEER shall <br />make an inspection of the Work to determine the <br />status of completion. If ENGINEER does not consider <br />the Work substantially complete, ENGINEER will <br />notify CONTRACTOR in writing giving the reasons <br />therefore. If €N61N€€R sens+deFs the WeFk <br />sdbstantiallyeeMplete, ENGINEER will pirepaire and <br />deliver to OWNER ER a tentat; V 8 GeFt f i2t f c k t tit4 <br />GeMpletiOR WhilGh shall fix the date of SwbStaRtial <br />B. OWNER shall have the right to exclude <br />CONTRACTOR from the Site after the date of <br />Substantial Completion, but OWNER shall allow COW <br />TRACTOR reasonable access to complete or correct <br />items on the tentative list. <br />14.05 Partial Utilization <br />A. Use by OWNER at OWNER's option of any <br />substantially completed part of the Work which has <br />specifically been identified in the Contract Documents, <br />or which OWNER, ENGINEER, and CONTRACTOR <br />agree constitutes a separately functioning and usable <br />part of the Work that can be used by OWNER for its <br />intended purpose without significant interference with <br />CONTRACTOR's performance of the remainder of <br />the Work, may be accomplished prior to Substantial <br />Completion of all the Work subject to the following <br />conditions. <br />1. OWNER at any time may request <br />CONTRACTOR in writing to permit OWNER to <br />use any such part of the Work which OWNER <br />00700 -General Conditions REV 04-07.doc <br />00700 - 40 <br />i Works\ENGINEERING DIVISION PROJECTS\1024-17th Street and IR Blvd Iniersectlon\AdmimlContracl Documents\00700 -General Conditions REV 04-07.doc <br />., <br />• <br />shall have <br />seven <br />da• <br />111/isirk <br />is <br />rAAGIwdes <br />Pint <br />AAlr;f;W5, <br />If <br />ALCiAd�nti'AL4 <br />AS .. <br />- <br />• <br />Oki <br />1,11MM <br />MM <br />AP <br />. <br />ew <br />. <br />Ll <br />. <br />., <br />- <br />and <br />., JNJ <br />-. <br />.., <br />agree <br />se R <br />WF- <br />B. OWNER shall have the right to exclude <br />CONTRACTOR from the Site after the date of <br />Substantial Completion, but OWNER shall allow COW <br />TRACTOR reasonable access to complete or correct <br />items on the tentative list. <br />14.05 Partial Utilization <br />A. Use by OWNER at OWNER's option of any <br />substantially completed part of the Work which has <br />specifically been identified in the Contract Documents, <br />or which OWNER, ENGINEER, and CONTRACTOR <br />agree constitutes a separately functioning and usable <br />part of the Work that can be used by OWNER for its <br />intended purpose without significant interference with <br />CONTRACTOR's performance of the remainder of <br />the Work, may be accomplished prior to Substantial <br />Completion of all the Work subject to the following <br />conditions. <br />1. OWNER at any time may request <br />CONTRACTOR in writing to permit OWNER to <br />use any such part of the Work which OWNER <br />00700 -General Conditions REV 04-07.doc <br />00700 - 40 <br />i Works\ENGINEERING DIVISION PROJECTS\1024-17th Street and IR Blvd Iniersectlon\AdmimlContracl Documents\00700 -General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.