My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-204A
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 12:07:28 PM
Creation date
10/1/2015 2:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2011
Control Number
2011-204A
Agenda Item Number
12.I.1
Entity Name
Timothy Rose Contracting
Subject
Intersection Improvements Indian River Boulevard
Area
Indian River Boulevard and 17th St.
Project Number
1024
Bid Number
2011048
Supplemental fields
SmeadsoftID
10258
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. <br />EFFECTIVE DATE: <br />DATE OF ISSUANCE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: Indian River Blvd. & 17`h St. Intersection Improvements <br />Project No. 1024 Bid No. 2011048 <br />ENGINEER: Indian River County <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices: <br />II Unit Prices <br />L1 Lump Sum <br />II <br />tractor'Records <br />Other: <br />[1 By Change Order: <br />Estimated increase (decrease) in Contract Price: <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Method of determining change in <br />Contract Times <br />II Cons <br />II Engineer's Records <br />[1 Other: <br />II By Change Order: <br />Estimated increase (decrease) in Contract Times: <br />Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />* *END OF SECTION <br />F:\Public Works\ENGINEERING DIVISION PROJEC7 <br />S\1024-17thStreet and IR Blvd Intersection\Admim\Contract <br />Documents100948 -Work Change Directive REV 04-07.doc <br />ACCEPTED: <br />By: <br />RECOMMENDED: <br />By: <br />APPROVED: <br />By: <br />CONTRACTOR (Signature) <br />Date: <br />ENGINEER (Signature) <br />Date: <br />OWNER (Signature) <br />Date: <br />* *END OF SECTION <br />F:\Public Works\ENGINEERING DIVISION PROJEC7 <br />S\1024-17thStreet and IR Blvd Intersection\Admim\Contract <br />Documents100948 -Work Change Directive REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.