Laserfiche WebLink
1.6 DAMAGE - <br />SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />EXISTING STRUCTURES AND UTILITIES <br />A. The CONTRACTOR shall be responsible for and make good all damage to <br />pavement beyond the limits of this Contract, buildings, telephone or other <br />cables, water pipes, sanitary pipes, or other structures which may e <br />encountered, whether or not shown on the Drawings. <br />B. Information shown on the Drawings as to the location of existing utilities has <br />been prepared from the most reliable data available to the Engineer. This <br />information is not guaranteed, however, and it shall be this CONTRACTOR 's <br />responsibility to determine the location, character and depth of any existing <br />utilities. He shall assist the utility companies, by every means possible to <br />determine said locations. Extreme caution shall be exercised to eliminate any <br />possibility of any damage to utilities resulting from his activities. <br />1.7 <br />�JUSTMEN- <br />OF UTILIT` <br />TIN <br />OVERS A <br />BOXE <br />A. All existing utility castings, including valve boxes, junction boxes, manholespull <br />boxes, inlets and similar structures in the areas of construction that are to , <br />remain in service shall be adjusted by the CONTRACTOR to bring them flush <br />with the surface of the finished work. <br />B. The CONTRACTOR shall coordinate the utilities to ensure proper construction <br />sequencing. CONTRACTOR shall make available survey reference markers to <br />the various utility companies. <br />+ +END OF SECTION + + <br />01541-5 F:\Public Works\ENGINEERING DIVISION <br />PROJECTS\1024-17thStreet and IR Blvd Intersection\Admim\Contract Documents\01541 -Protection of <br />Property.doc <br />