Laserfiche WebLink
existing conditions. All traffic control devices shall conform to MUTCD standards <br />and shall be clean and relatively undamaged. Damaged devices diminishing <br />legibility and recognition, during either night or day conditions, are not acceptable <br />for use. <br />WAIVER OF LIABILITY: The Contractor shall conduct his operations in such a <br />manner that no undue hazard will result due to the requirements of this article, and <br />the procedures and policies described therein shall in no way act as a waiver of any <br />of the terms of the liability of the Contractor or his surety. <br />F. Non -Compliance: Should the Owner or Engineer determine that traffic within the <br />project is not being maintained in accordance with the approved traffic control plan <br />or presents a public safety concern, the contractor shall have until the end of the <br />working day, in which notification is given, to take action to modify the maintenance <br />of traffic. Should the contractor fail to make such modification the Owner shall have <br />the option to fine the Contractor $400 per day until remedied. <br />G. Contractor's Maintenance of Traffic Plan shall maintain continuous vehicular traffic <br />on Indian River Boulevard and 17th Street all times. Owner shall have option to <br />fine the Contractor $1,000.00 per day for Maintenance of Traffic Plan non- <br />compliance. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 102-1 - Maintenance of Traffic - Lump Sum <br />SECTION —104 -EROSION CONTROL AND TREATMENT OF DEWATERING <br />WATER AND aORMWATER FROM THE CONSTRUCTION SITE <br />PART 1 —GENERAL <br />1.1 SCOPE <br />A. This Section covers erosion control and the treatment of dewatering water and <br />stormwater runoff from the construction site and work area. The pollution control <br />measures shall prevent turbid or otherwise polluted waters from being discharged from <br />the construction site or work area, to undeveloped portions of the site or off-site. <br />B. The OWNER considers pollution from dewatering water and stormwater runoff from a <br />construction site or work area to be a very serious offense. The CONTRACTOR is <br />solely responsible for preventing pollution caused by dewatering water and stormwater <br />runoff from the construction site or work area. <br />C. The pollution control measures specified herein represent minimum standards to be <br />adhered to by the CONTRACTOR throughout the Project's construction. The OWNER <br />reserves the right to require the CONTRACTOR to employ additional pollution control <br />measures, when in the sole opinion of the OWNER, they are warranted. If site specific <br />01025-4 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS11024-17thStreet and IR Blvd Intersection\Admim\Contract <br />Documents\Technical Specifications.doc <br />