My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-204A
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 12:07:28 PM
Creation date
10/1/2015 2:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2011
Control Number
2011-204A
Agenda Item Number
12.I.1
Entity Name
Timothy Rose Contracting
Subject
Intersection Improvements Indian River Boulevard
Area
Indian River Boulevard and 17th St.
Project Number
1024
Bid Number
2011048
Supplemental fields
SmeadsoftID
10258
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
120-1.2.3 Earthwork Category 3: Includes the earthwork and related <br />operations associated with the construction of new mainline pavement, along with concrete <br />box culverts, retaining walls, and other drainage structures on the mainline pavement. <br />120-2 Classes of Excavation. <br />120-2.1 Excavation of Unsuitable Material: Excavation of unsuitable material <br />consists of the removal of muck, clay, rock or any other material that is unsuitable in its <br />original position and that is excavated below the finished grading template. For stabilized <br />bases and sand bituminous road mixes, the finished grading template is the top of the <br />finished base, shoulders and slopes. For all other bases and rigid pavement, the finished <br />grading template is the finished shoulder and slope lines and bottom of completed base or <br />rigid pavement. <br />120-2.2 Lateral Ditch Excavation: Lateral Ditch Excavation consists of all <br />excavation of inlet and outlet ditches to structures and roadway, changes in channels of <br />streams, and ditches parallel to the roadway right-of-way. Dress lateral ditches to the grade <br />and cross-section shown in the plans. <br />120-2.3 Channel Excavation: Channel Excavation consists of the excavation <br />and satisfactory disposal of all materials from the limits of the channel as shown in the plans. <br />120-2.4 Excavation for Structures and Pipe: Excavation for Structures <br />consists of the excavation for bridge foundations, box culverts, pipe culverts, storm sewers <br />and all other pipe lines, retaining walls, headwalls for pipe culverts and drains, catch basins, <br />drop inlets, manholes, and similar structures. <br />120-3 Excavation Requirements. <br />120-3.1 Excavation and Replacement of Unsuitable Materials: Where rock, <br />muck, clay, or other material within the limits of the roadway is unsuitable in its original <br />position, excavate such material to the cross-sections shown in the plans or indicated by the <br />Engineer, and backfill with suitable material. Shape backfill materials to the required cross- <br />sections. Where the removal of plastic soils below the finished earthwork grade is required, <br />meet a construction tolerance of ± 0.2 foot in depth and ± 6 inches (each side) in width. <br />120-3.2 Lateral Ditch Excavation: Excavate inlet and outlet ditches to <br />structures and roadway, changes in channels of streams and ditches parallel to the roadway. <br />Dress lateral ditches to the grade and cross-section shown in the plans. <br />120-3.3 Channel Excavation: Excavate and dispose of all materials from the <br />limits of the channel as shown in the plans. Excavate for bridge foundations, box culverts, <br />pipe culverts, storm sewers and all other pipe lines, retaining walls, headwalls for pipe culverts <br />and drains, catch basins, drop inlets, manholes, and similar structures. <br />120-3.4 Excavation for Structures and Pipe. <br />120-3.4.1 Requirements for all Excavation: Excavate foundation pits to permit <br />the placing of the full widths and lengths of footings shown in the plans, with full horizontal <br />beds. Do not round or undercut corners or edges of footings. Perform all excavation to <br />foundation materials, satisfactory to the Engineer, regardless of the elevation shown on the <br />plans. Perform all excavation in stream beds to a depth at least 4 feet below the permanent <br />bed of the stream, unless a firm footing can be established on solid rock before such depth is <br />reached, and excavate to such additional depth as may be necessary to eliminate any danger <br />of undermining. Wherever rock bottom is secured, excavate in such manner as to allow the <br />solid rock to be exposed and prepared in horizontal beds for receiving the masonry. Remove <br />01025-21 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1024-17thStreet and IR Blvd Intersection\Admim\Contract Documents\Technical <br />Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.